| COMPLETE PERMIT** | | | | |
|
| BLDG FINAL CERT OF COMP | | | | |
|
| ENERGY ENVELOPE | | | | |
|
| SHEATHING AND FLASHING | | | | |
|
| SLAB | | | | |
|
05/28/2021 | LOCATION SETBACKS | JEFF CHUBY | PARTIAL | | 5/28/2021 9:47:53 AM
2 Piers in basement. Need to see right side footings once dug.
|
|
05/28/2021 | FOOTING | JEFF CHUBY | PARTIAL | | 5/28/2021 9:48:20 AM
2 Piers in basement. Need to see right side footings once dug.
|
|
06/29/2021 | FOOTING | JEFF CHUBY | APPROVED | | |
|
| FOOTING | JEFF CHUBY | | | |
|
06/29/2021 | LOCATION SETBACKS | JEFF CHUBY | APPROVED | | |
|
07/20/2021 | FOUNDATION | DANA LAPISH | PARTIAL | | 7/20/2021 10:08:12 AM
Small Rt. side section Block work and I-joist floor framing. Pending Dampproofing
|
|
| FOUNDATION | DANA LAPISH | | | 7/20/2021 10:08:16 AM
Small Rt. side section Block work and I-joist floor framing. Pending Dampproofing
7/28/2021 10:52:09 AM
Small Rt. side section Block work and I-joist floor framing. Pending Dampproofing
|
|
| PLUMBING FINAL CERT OF COMP | | | | |
|
07/28/2021 | FOUNDATION | DANA LAPISH | APPROVED | | 7/20/2021 10:08:16 AM
Small Rt. side section Block work and I-joist floor framing. Pending Dampproofing
|
|
07/28/2021 | PLUMBING SLAB | DANA LAPISH | APPROVED | | |
|
07/28/2021 | FOUNDATION | DANA LAPISH | APPROVED | | 7/28/2021 3:38:11 PM
Damp proofing
|
|
| PLUMBING SLAB | | | | |
|
09/17/2021 | FIELD CONSULTATION | DANA LAPISH | INCOMPLETE | | 9/17/2021 1:44:12 PM
Meet with Mark Lewis to look at framing
|
|
09/21/2021 | PLUMBING ROUGH | GRANT MILLER | REJECTED | | 9/21/2021 11:52:09 AM
S-trap on washer, flat dry vent on master shower. Plumbing was not complete at time of inspection.
|
|
| PLUMBING ROUGH | | | | |
|
09/22/2021 | PLUMBING ROUGH | DANA LAPISH | REJECTED | | 9/22/2021 2:06:10 PM
Master shower vent horizonal and dry / Vent on Powder room and tub in basement is below flood level rim of fixtures
|
|
| PLUMBING ROUGH | DANA LAPISH | | | 9/22/2021 2:06:14 PM
Master shower vent horizonal and dry / Vent on Powder room and tub in basement is below flood level rim of fixtures
|
|
| PLUMBING ROUGH | | | | |
|
| FIREPLACE FINAL | | | LIVING ROOM AND DOWNSTAIRS FIREPLACES | |
|
09/28/2021 | PLUMBING ROUGH | GRANT MILLER | APPROVED | | |
|
| ELEC UNDERGROUND | | | | |
|
| ELECTRICAL SLAB | | | | |
|
| ELECTRICAL FINAL CERT OF COMP | | | | |
|
10/19/2021 | FIREPLACE ROUGH | STEPHEN SANDERS | APPROVED | LIVING ROOM AND DOWNSTAIRS FIREPLACES | |
|
| MECHANICAL FINAL CERT OF COMP | | | | |
|
10/27/2021 | ELECTRICAL ROUGH | STEPHEN SANDERS | APPROVED | | |
|
10/27/2021 | MECHANICAL ROUGH | STEPHEN SANDERS | APPROVED | | |
|
11/03/2021 | FRAMING | DANA LAPISH | APPROVED | | |
|
11/23/2021 | INSULATION | DANA LAPISH | APPROVED | | |
|
12/07/2021 | FOOTING | DANA LAPISH | APPROVED | | 12/7/2021 4:14:51 PM
Rear deck footings
|
|
12/21/2021 | SHOWER PAN | DANA LAPISH | APPROVED | | 12/21/2021 4:41:42 PM
3 pans
|
|
01/27/2022 | SERVICE CHANGE | DANA LAPISH | APPROVED | | 1/27/2022 2:57:51 PM
Replaced meter can and added new panels
|
|
03/17/2022 | GAS PIPING ROUGH | MARK POPE | REJECTED | | 3/17/2022 1:06:38 PM
* 0 psi on test gauge *
|
|
03/18/2022 | GAS PIPING ROUGH | DANA LAPISH | APPROVED | | 3/17/2022 1:06:43 PM
* 0 psi on test gauge *
|
|
03/24/2022 | GAS PIPING FINAL | DANA LAPISH | APPROVED | | |
|
03/24/2022 | PLUMBING FINAL CERT OF COMP | DANA LAPISH | REJECTED | | 3/24/2022 9:51:34 AM
Add AAV on Lav. 2nd floor can not have S-Trap / Seal wall around pipes or cover holes under sinks and Lavs,
|
|
| PLUMBING FINAL CERT OF COMP | | | | |
|
03/25/2022 | ELEC ABOVE CEILING | DANA LAPISH | APPROVED | | 3/25/2022 10:05:40 AM
Basement ceiling ok to drop Tiles
|
|