| SLAB | | | | |
|
11/09/2020 | SAW SERVICE | DANA LAPISH | APPROVED | | |
|
11/17/2020 | FOOTING | JEFF CHUBY | APPROVED | | |
|
11/17/2020 | GRADING RES | JEFF CHUBY | PARTIAL | | 11/17/2020 1:28:23 PM
Pending Final grade
|
|
11/17/2020 | LOCATION SETBACKS | JEFF CHUBY | APPROVED | | 11/17/2020 1:28:34 PM
Surveyed
|
|
12/02/2020 | FOUNDATION | JEFF CHUBY | PARTIAL | | 12/2/2020 3:55:07 PM
Smooth and level crawlspace area to maintain proper clearance and
grade. Foundation, dampproofing and drain okay.
|
|
12/07/2020 | FOUNDATION | JEFF CHUBY | APPROVED | | 12/2/2020 3:55:10 PM
Smooth and level crawlspace area to maintain proper clearance and
grade. Foundation, dampproofing and drain okay.
|
|
12/08/2020 | FRAMING | JEFF CHUBY | PARTIAL | | 12/8/2020 1:28:39 PM
Floor Framing okay
|
|
01/07/2021 | GARAGE PORCH SLAB | GRANT MILLER | APPROVED | | |
|
02/18/2021 | FIREPLACE ROUGH | JEFF CHUBY | PARTIAL | | 2/18/2021 12:15:30 PM
Fire block at ceiling height and install standoff collar; terminate vent
through the top of chimney chase.
|
|
02/22/2021 | SHEATHING AND FLASHING | JEFF CHUBY | REJECTED | Cupola only | 2/22/2021 12:53:31 PM
Tape all holes and vertical joints in house wrap; install sill flashing as
per window manufacturer installation instructions all the way to the
interior edge of sill framing.
|
|
02/24/2021 | SHEATHING AND FLASHING | JEFF CHUBY | REJECTED | Cupola only | 2/22/2021 12:53:40 PM
Tape all holes and vertical joints in house wrap; install sill flashing as
per window manufacturer installation instructions all the way to the
interior edge of sill framing.
2/24/2021 3:06:24 PM
Same as before - install sill flashing per manufacturer installation
instructions (flashing needs to go up the sides, across the bottom and
rolled out, with another layer overlapping the first and coming flush
to the interior of the framed opening) - see installation instructions.
|
|
| PLUMBING ROUGH | | | | |
|
| PLUMBING SLAB | | | | |
|
03/02/2021 | PLUMBING ROUGH | JEFF CHUBY | APPROVED | | |
|
03/02/2021 | SHEATHING AND FLASHING | JEFF CHUBY | APPROVED | Cupola only | 2/24/2021 3:06:29 PM
Tape all holes and vertical joints in house wrap; install sill flashing as
per window manufacturer installation instructions all the way to the
interior edge of sill framing.
2/24/2021 3:06:29 PM
Same as before - install sill flashing per manufacturer installation
instructions (flashing needs to go up the sides, across the bottom and
rolled out, with another layer overlapping the first and coming flush
to the interior of the framed opening) - see installation instructions.
|
|
03/02/2021 | PLUMBING ROUGH | JEFF CHUBY | APPROVED | | |
|
03/08/2021 | ELECTRICAL ROUGH | GRANT MILLER | APPROVED | | |
|
03/09/2021 | GAS PIPING ROUGH | JEFF CHUBY | APPROVED | | |
|
03/09/2021 | MECHANICAL ROUGH | JEFF CHUBY | APPROVED | | |
|
03/09/2021 | GAS PIPING ROUGH | JEFF CHUBY | APPROVED | eTRAKiT Inspection Request | 3/8/2021 3:49:51 PM
3/8/2021 3:49 PM CLIMATECH HEATING & COOLING INC
Contact Name: CLIMATECH HEATING & COOLING INC
Site Address: 129 SAYLORS WATCH LN
Phone: 7044837343
e-Mail: terri@climatechnc.com
|
|
03/09/2021 | MECHANICAL ROUGH | JEFF CHUBY | APPROVED | eTRAKiT Inspection Request | 3/8/2021 3:50:21 PM
3/8/2021 3:50 PM CLIMATECH HEATING & COOLING INC
Contact Name: CLIMATECH HEATING & COOLING INC
Site Address: 129 SAYLORS WATCH LN
Phone: 7044837343
e-Mail: terri@climatechnc.com
|
|
03/10/2021 | LOW VOLTAGE ROUGH | GRANT MILLER | APPROVED | EASY LIVING AUDIO VIDEO LLC | |
|
03/16/2021 | FRAMING | DANA LAPISH | REJECTED | | 12/8/2020 1:28:42 PM
Floor Framing okay
3/11/2021 12:56:43 PM
Need to fireblock around steel columns going through floor to crawl. Need to fireblock ceiling level of chimney chase in cathedral room on sec floor and the chimney needs a metal firestop around in where it passes through the plywood at the intermediate level.
One front bedroom on the sec floor will need a window seat etc. The window sill is too high for emergency egress.
3/16/2021 11:07:23 AM
Insulating with spray Foam process Could not Enter
|
|
03/22/2021 | FRAMING | DANA LAPISH | REJECTED | | 3/16/2021 11:07:27 AM
Insulating with spray Foam process Could not Enter
3/16/2021 11:07:27 AM
Need to fireblock around steel columns going through floor to crawl. Need to fireblock ceiling level of chimney chase in cathedral room on sec floor and the chimney needs a metal firestop around in where it passes through the plywood at the intermediate level.
One front bedroom on the sec floor will need a window seat etc. The window sill is too high for emergency egress.
3/16/2021 11:07:27 AM
Floor Framing okay
3/22/2021 1:07:46 PM
Trim back wood on fireplace flue 2" and install metal fire collars at 1st and 2nd ceiling level. Pending engineer letter.
|
|
03/22/2021 | INSULATION | DANA LAPISH | PARTIAL | | 3/22/2021 1:07:55 PM
Spray foam pending insulation values and energy cetificate
|
|
03/25/2021 | FRAMING | DANA LAPISH | APPROVED | | 3/22/2021 1:07:54 PM
Insulating with spray Foam process Could not Enter
3/22/2021 1:07:54 PM
Need to fireblock around steel columns going through floor to crawl. Need to fireblock ceiling level of chimney chase in cathedral room on sec floor and the chimney needs a metal firestop around in where it passes through the plywood at the intermediate level.
One front bedroom on the sec floor will need a window seat etc. The window sill is too high for emergency egress.
3/22/2021 1:07:54 PM
Floor Framing okay
3/22/2021 1:07:54 PM
Trim back wood on fireplace flue 2" and install metal fire collars at 1st and 2nd ceiling level. Pending engineer letter.
3/25/2021 8:54:49 AM
Engineer's Letter in attachments
|
|
04/08/2021 | SHOWER PAN | JEFF CHUBY | APPROVED | | |
|
06/11/2021 | TEMPORARY POWER | STEPHEN SANDERS | APPROVED | | |
|
07/13/2021 | WATER SUPPLY | DANA LAPISH | APPROVED | | 7/13/2021 12:08:04 PM
From meter to house and house to pier area
|
|
| WATER SUPPLY | DANA LAPISH | | | 7/13/2021 12:08:38 PM
From meter to house and house to pier area
|
|
08/24/2021 | TEMPORARY POWER | STEPHEN SANDERS | APPROVED | renew 8/11-10/11/2021 | |
|
08/24/2021 | GAS PIPING FINAL | STEPHEN SANDERS | APPROVED | | |
|
09/09/2021 | FIREPLACE FINAL | STEPHEN SANDERS | APPROVED | eTRAKiT Inspection Request | 9/8/2021 2:23:41 PM
9/8/2021 2:23 PM PATRICK JOSEPH DISTINCTIVE HOMES LLC
Contact Name: PATRICK JOSEPH DISTINCTIVE HOMES LLC
Site Address: 129 SAYLORS WATCH LN
Phone: 7049297179
e-Mail: ACCOUNTING@PJDHOMES.COM
|
|
09/09/2021 | LOW VOLTAGE FINAL | STEPHEN SANDERS | APPROVED | eTRAKiT Inspection Request | 9/8/2021 2:23:20 PM
9/8/2021 2:23 PM PATRICK JOSEPH DISTINCTIVE HOMES LLC
Contact Name: PATRICK JOSEPH DISTINCTIVE HOMES LLC
Site Address: 129 SAYLORS WATCH LN
Phone: 7049297179
e-Mail: ACCOUNTING@PJDHOMES.COM
|
|
| LOW VOLTAGE FINAL | STEPHEN SANDERS | | | 9/9/2021 11:28:13 AM
9/8/2021 2:23 PM PATRICK JOSEPH DISTINCTIVE HOMES LLC
Contact Name: PATRICK JOSEPH DISTINCTIVE HOMES LLC
Site Address: 129 SAYLORS WATCH LN
Phone: 7049297179
e-Mail: ACCOUNTING@PJDHOMES.COM
|
|
| OPERATION | BRYANT WHITE | APPROVED | Galle Excavation | |
|
09/15/2021 | ELEC UNDERGROUND | DANA LAPISH | APPROVED | | 9/15/2021 12:47:53 PM
Conduit to pier panel and septic tank
|
|
09/15/2021 | ELECTRICAL FINAL CERT OF COMP | DANA LAPISH | REJECTED | | 9/14/2021 5:13:35 PM
Rescheduled next day
9/15/2021 12:49:06 PM
Add outlets beside kit. sink per code
|
|
09/15/2021 | MECHANICAL FINAL CERT OF COMP | DANA LAPISH | APPROVED | | 9/14/2021 5:14:08 PM
Rescheduled next day
|
|
09/15/2021 | PLUMBING FINAL CERT OF COMP | DANA LAPISH | REJECTED | | 9/14/2021 5:14:35 PM
Rescheduled next day
9/15/2021 12:49:14 PM
Insulate water lines outside on water heaters and install regulators on gas line
|
|
09/15/2021 | SEWER | DANA LAPISH | APPROVED | | 9/14/2021 4:46:41 PM
9/14/2021 4:46 PM PATRICK JOSEPH DISTINCTIVE HOMES LLC
Contact Name: PATRICK JOSEPH DISTINCTIVE HOMES LLC
Site Address: 129 SAYLORS WATCH LN
Phone: 7049297179
e-Mail: ACCOUNTING@PJDHOMES.COM
|
|
09/22/2021 | PLUMBING FINAL CERT OF COMP | DANA LAPISH | APPROVED | | 9/15/2021 12:49:18 PM
Insulate water lines outside on water heaters and install regulators on gas line
9/15/2021 12:49:18 PM
Rescheduled next day
9/20/2021 4:22:28 PM
9/20/2021 4:22 PM PATRICK JOSEPH DISTINCTIVE HOMES LLC
Contact Name: PATRICK JOSEPH DISTINCTIVE HOMES LLC
Site Address: 129 SAYLORS WATCH LN
Phone: 7049297179
e-Mail: ACCOUNTING@PJDHOMES.COM
9/21/2021 3:58:32 PM
Rescheduled next day
|
|
09/24/2021 | BLDG FINAL CERT OF COMP | DANA LAPISH | APPROVED | | 9/23/2021 3:33:58 PM
9/23/2021 3:34 PM PATRICK JOSEPH DISTINCTIVE HOMES LLC
Contact Name: PATRICK JOSEPH DISTINCTIVE HOMES LLC
Site Address: 129 SAYLORS WATCH LN
Phone: 7049297179
e-Mail: ACCOUNTING@PJDHOMES.COM
|
|
09/24/2021 | CERT OF OCCUPANCY | DANA LAPISH | APPROVED | | |
|
09/24/2021 | COMPLETE PERMIT** | DANA LAPISH | APPROVED | | |
|
09/24/2021 | ELECTRICAL FINAL CERT OF COMP | DANA LAPISH | APPROVED | eTRAKiT Inspection Request | 9/15/2021 12:49:10 PM
Add outlets beside kit. sink per code
9/15/2021 12:49:10 PM
Rescheduled next day
9/23/2021 3:32:59 PM
9/23/2021 3:33 PM PATRICK JOSEPH DISTINCTIVE HOMES LLC
Contact Name: PATRICK JOSEPH DISTINCTIVE HOMES LLC
Site Address: 129 SAYLORS WATCH LN
Phone: 7049297179
e-Mail: ACCOUNTING@PJDHOMES.COM
|
|
09/24/2021 | ENERGY ENVELOPE | DANA LAPISH | APPROVED | eTRAKiT Inspection Request | 9/23/2021 3:33:17 PM
9/23/2021 3:33 PM PATRICK JOSEPH DISTINCTIVE HOMES LLC
Contact Name: PATRICK JOSEPH DISTINCTIVE HOMES LLC
Site Address: 129 SAYLORS WATCH LN
Phone: 7049297179
e-Mail: ACCOUNTING@PJDHOMES.COM
|
|
09/24/2021 | GRADING RES | DANA LAPISH | APPROVED | | 11/17/2020 1:28:30 PM
Pending Final grade
|
|
09/24/2021 | INSULATION | DANA LAPISH | APPROVED | | 3/22/2021 1:07:58 PM
Spray foam pending insulation values and energy cetificate
9/24/2021 2:15:38 PM
Reports in panel
|
|
09/24/2021 | ELECTRICAL SLAB | DANA LAPISH | APPROVED | | 9/24/2021 3:15:19 PM
Underground to pier panel and septic tank
|
|
09/24/2021 | FIREPLACE ROUGH | DANA LAPISH | APPROVED | | 2/18/2021 12:15:38 PM
Fire block at ceiling height and install standoff collar; terminate vent
through the top of chimney chase.
9/24/2021 3:16:22 PM
Looked at framing inspection 3-25-21
|
|