| TEMPORARY POWER | | | | |
|
05/12/2020 | FOOTING | JEFF CHUBY | PARTIAL | | 5/12/2020 3:29:56 PM
Plans marked - pending engineer letter for soils and Footings.
|
|
05/12/2020 | LOCATION SETBACKS | JEFF CHUBY | APPROVED | | |
|
05/14/2020 | FOOTING | JEFF CHUBY | PARTIAL | | 5/14/2020 1:46:11 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
|
|
05/15/2020 | FOOTING | JEFF CHUBY | PARTIAL | | 5/12/2020 3:30:03 PM
Plans marked - pending engineer letter for soils and Footings.
5/14/2020 1:46:22 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
5/15/2020 11:06:58 AM
Plans marked. Pending engineer report for soils and Footings
|
|
05/15/2020 | FOOTING | JEFF CHUBY | PARTIAL | | |
|
05/18/2020 | FOOTING | JEFF CHUBY | PARTIAL | | 5/12/2020 3:30:01 PM
Plans marked - pending engineer letter for soils and Footings.
5/14/2020 1:46:22 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
5/15/2020 11:07:02 AM
Plans marked - pending engineer letter for soils and Footings.
5/15/2020 11:07:02 AM
Plans marked. Pending engineer reports for soil and rebar/Footings
5/15/2020 11:07:02 AM
Plans marked. Pending engineer report for soils and Footings
5/18/2020 8:54:44 AM
Inspection voided by JWC.
5/18/2020 3:37:25 PM
Plans marked. Pending engineer letter for soils and Footings
|
|
05/18/2020 | PLUMBING ROUGH | DANA LAPISH | INCOMPLETE | | 5/15/2020 9:36:13 AM
PM Please
5/18/2020 3:45:36 PM
Plumbing Consultation about site sewer & water lines
|
|
05/27/2020 | FOOTING | JEFF CHUBY | INCOMPLETE | | |
|
05/27/2020 | FOOTING | JEFF CHUBY | INCOMPLETE | | |
|
05/27/2020 | PLUMBING ROUGH | DANA LAPISH | INCOMPLETE | | 5/18/2020 3:46:06 PM
Plumbing Consultation about site sewer & water lines
5/18/2020 3:46:09 PM
PM Please
5/27/2020 3:04:50 PM
Consultation with Plumbing Contractor
|
|
05/28/2020 | FOOTING | JEFF CHUBY | INCOMPLETE | | |
|
06/01/2020 | PLUMBING ROUGH | JEFF CHUBY | INCOMPLETE | | 5/27/2020 3:04:54 PM
Plumbing Consultation about site sewer & water lines
5/27/2020 3:04:54 PM
PM Please
5/27/2020 3:04:54 PM
Consultation with Plumbing Contractor
6/1/2020 3:09:38 PM
Sprinkler main underground
|
|
06/01/2020 | FOOTING | JEFF CHUBY | PARTIAL | | 5/18/2020 3:37:31 PM
Plans marked - pending engineer letter for soils and Footings.
5/18/2020 3:37:31 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
5/18/2020 3:37:31 PM
Plans marked - pending engineer letter for soils and Footings.
5/18/2020 3:37:31 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
5/18/2020 3:37:31 PM
Plans marked. Pending engineer report for soils and Footings
5/18/2020 3:37:31 PM
Plans marked. Pending engineer letter for soils and Footings
5/18/2020 3:37:31 PM
Inspection voided by JWC.
6/1/2020 3:09:44 PM
Plans marked. Pending engineer letters
|
|
06/01/2020 | PLUMBING ROUGH | JEFF CHUBY | INCOMPLETE | | |
|
06/02/2020 | ELEC UNDERGROUND | DANA LAPISH | PARTIAL | | 6/2/2020 2:53:12 PM
1" conduit to sign north end and 1 1/4' & 1" to backflow devices south
end Marked on plans
|
|
06/02/2020 | FOOTING | JEFF CHUBY | PARTIAL | | 6/2/2020 3:39:01 PM
Plans marked. Pending engineer reports
|
|
06/03/2020 | PLUMBING SLAB | DANA LAPISH | PARTIAL | | 6/3/2020 11:49:06 AM
Area east end DWV marked on plans
|
|
06/03/2020 | FOOTING | JEFF CHUBY | PARTIAL | | 6/1/2020 3:09:47 PM
Plans marked - pending engineer letter for soils and Footings.
6/1/2020 3:09:47 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/1/2020 3:09:47 PM
Plans marked - pending engineer letter for soils and Footings.
6/1/2020 3:09:47 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/1/2020 3:09:47 PM
Plans marked. Pending engineer report for soils and Footings
6/1/2020 3:09:47 PM
Plans marked. Pending engineer letter for soils and Footings
6/1/2020 3:09:47 PM
Inspection voided by JWC.
6/1/2020 3:09:47 PM
Plans marked. Pending engineer letters
6/3/2020 3:06:52 PM
Plans marked. Pending engineer reports
|
|
06/03/2020 | FOOTING | JEFF CHUBY | PARTIAL | | 6/3/2020 3:37:18 PM
Plans marked. Pending engineer reports
|
|
06/04/2020 | FOOTING | JEFF CHUBY | PARTIAL | | 6/1/2020 3:09:48 PM
Plans marked - pending engineer letter for soils and Footings.
6/1/2020 3:09:48 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/1/2020 3:09:48 PM
Plans marked - pending engineer letter for soils and Footings.
6/1/2020 3:09:48 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/1/2020 3:09:48 PM
Plans marked. Pending engineer report for soils and Footings
6/1/2020 3:09:48 PM
Plans marked. Pending engineer letter for soils and Footings
6/1/2020 3:09:48 PM
Inspection voided by JWC.
6/1/2020 3:09:48 PM
Plans marked. Pending engineer letters
6/3/2020 3:06:57 PM
Plans marked - pending engineer letter for soils and Footings.
6/3/2020 3:06:57 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/3/2020 3:06:57 PM
Plans marked - pending engineer letter for soils and Footings.
6/3/2020 3:06:57 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/3/2020 3:06:57 PM
Plans marked. Pending engineer report for soils and Footings
6/3/2020 3:06:58 PM
Plans marked. Pending engineer letter for soils and Footings
6/3/2020 3:06:58 PM
Inspection voided by JWC.
6/3/2020 3:06:58 PM
Plans marked. Pending engineer letters
6/3/2020 3:06:58 PM
Plans marked. Pending engineer reports
6/4/2020 1:11:38 PM
Plans marked. Pending engineer letters
|
|
06/05/2020 | FOOTING | JEFF CHUBY | PARTIAL | | 6/1/2020 3:09:49 PM
Plans marked - pending engineer letter for soils and Footings.
6/1/2020 3:09:49 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/1/2020 3:09:49 PM
Plans marked - pending engineer letter for soils and Footings.
6/1/2020 3:09:49 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/1/2020 3:09:49 PM
Plans marked. Pending engineer report for soils and Footings
6/1/2020 3:09:49 PM
Plans marked. Pending engineer letter for soils and Footings
6/1/2020 3:09:49 PM
Inspection voided by JWC.
6/1/2020 3:09:49 PM
Plans marked. Pending engineer letters
6/3/2020 3:06:58 PM
Plans marked - pending engineer letter for soils and Footings.
6/3/2020 3:06:58 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/3/2020 3:06:59 PM
Plans marked - pending engineer letter for soils and Footings.
6/3/2020 3:06:59 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/3/2020 3:06:59 PM
Plans marked. Pending engineer report for soils and Footings
6/3/2020 3:06:59 PM
Plans marked. Pending engineer letter for soils and Footings
6/3/2020 3:06:59 PM
Inspection voided by JWC.
6/3/2020 3:06:59 PM
Plans marked. Pending engineer letters
6/3/2020 3:06:59 PM
Plans marked. Pending engineer reports
6/4/2020 1:11:42 PM
Plans marked - pending engineer letter for soils and Footings.
6/4/2020 1:11:42 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/4/2020 1:11:42 PM
Plans marked - pending engineer letter for soils and Footings.
6/4/2020 1:11:42 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/4/2020 1:11:42 PM
Plans marked. Pending engineer report for soils and Footings
6/4/2020 1:11:43 PM
Plans marked. Pending engineer letter for soils and Footings
6/4/2020 1:11:43 PM
Inspection voided by JWC.
6/4/2020 1:11:43 PM
Plans marked. Pending engineer letters
6/4/2020 1:11:43 PM
Plans marked - pending engineer letter for soils and Footings.
6/4/2020 1:11:43 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/4/2020 1:11:43 PM
Plans marked - pending engineer letter for soils and Footings.
6/4/2020 1:11:43 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/4/2020 1:11:43 PM
Plans marked. Pending engineer report for soils and Footings
6/4/2020 1:11:43 PM
Plans marked. Pending engineer letter for soils and Footings
6/4/2020 1:11:44 PM
Inspection voided by JWC.
6/4/2020 1:11:44 PM
Plans marked. Pending engineer letters
6/4/2020 1:11:44 PM
Plans marked. Pending engineer reports
6/4/2020 1:11:44 PM
Plans marked. Pending engineer letters
6/5/2020 1:26:03 PM
Plans marked. Pending engineer reports
|
|
06/05/2020 | ELEC UNDERGROUND | DANA LAPISH | PARTIAL | | 6/2/2020 2:53:16 PM
1" conduit to sign north end and 1 1/4' & 1" to backflow devices south
end Marked on plans
6/5/2020 1:44:28 PM
Continuation of conduits to back flows and sign into Bldg.
Marked on plans
|
|
06/05/2020 | ELECTRICAL SLAB | DANA LAPISH | PARTIAL | | 6/5/2020 1:44:32 PM
Main conduit bank from electrical room to south end of Bldg.
Marked on plans
|
|
06/08/2020 | PLUMBING ROUGH | DANA LAPISH | PARTIAL | | 6/1/2020 3:09:43 PM
Plumbing Consultation about site sewer & water lines
6/1/2020 3:09:43 PM
PM Please
6/1/2020 3:09:43 PM
Consultation with Plumbing Contractor
6/1/2020 3:09:43 PM
Sprinkler main underground
6/8/2020 2:55:15 PM
Site sewer starting at 1st manhole at end of Regency Rd. to
2nd. manhole running toward bldg.
|
|
06/08/2020 | FOOTING | JEFF CHUBY | PARTIAL | eTRAKiT Inspection Request | 6/5/2020 8:24:07 AM
6/5/2020 8:24 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/8/2020 3:41:43 PM
Plans marked. Pending engineer letters
|
|
06/09/2020 | ELEC UNDERGROUND | DANA LAPISH | PARTIAL | | 6/5/2020 1:44:31 PM
1" conduit to sign north end and 1 1/4' & 1" to backflow devices south
end Marked on plans
6/5/2020 1:44:31 PM
Continuation of conduits to back flows and sign into Bldg.
Marked on plans
6/9/2020 12:00:15 PM
Conduits out to curb area for Future MRI and to procedure rooms from electrical room
|
|
06/11/2020 | ELEC UNDERGROUND | DANA LAPISH | PARTIAL | | 6/9/2020 12:00:22 PM
1" conduit to sign north end and 1 1/4' & 1" to backflow devices south
end Marked on plans
6/9/2020 12:00:23 PM
Continuation of conduits to back flows and sign into Bldg.
Marked on plans
6/9/2020 12:00:23 PM
Conduits out to curb area for Future MRI and to procedure rooms from electrical room
6/11/2020 3:14:10 PM
Conduits runs from Elect. room to various areas Marked on plans
|
|
06/11/2020 | PLUMBING SLAB | DANA LAPISH | PARTIAL | | 6/3/2020 11:49:11 AM
Area east end DWV marked on plans
6/11/2020 3:14:15 PM
North-west end marked on plans
|
|
06/12/2020 | FOOTING | JEFF CHUBY | PARTIAL | | 6/3/2020 3:07:00 PM
Plans marked - pending engineer letter for soils and Footings.
6/3/2020 3:07:00 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/3/2020 3:07:00 PM
Plans marked - pending engineer letter for soils and Footings.
6/3/2020 3:07:00 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/3/2020 3:07:00 PM
Plans marked. Pending engineer report for soils and Footings
6/3/2020 3:07:01 PM
Plans marked. Pending engineer letter for soils and Footings
6/3/2020 3:07:01 PM
Inspection voided by JWC.
6/3/2020 3:07:01 PM
Plans marked. Pending engineer letters
6/3/2020 3:07:01 PM
Plans marked. Pending engineer reports
6/4/2020 1:11:44 PM
Plans marked - pending engineer letter for soils and Footings.
6/4/2020 1:11:44 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/4/2020 1:11:44 PM
Plans marked - pending engineer letter for soils and Footings.
6/4/2020 1:11:44 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/4/2020 1:11:45 PM
Plans marked. Pending engineer report for soils and Footings
6/4/2020 1:11:45 PM
Plans marked. Pending engineer letter for soils and Footings
6/4/2020 1:11:45 PM
Inspection voided by JWC.
6/4/2020 1:11:46 PM
Plans marked. Pending engineer letters
6/4/2020 1:11:50 PM
Plans marked - pending engineer letter for soils and Footings.
6/4/2020 1:11:50 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/4/2020 1:11:51 PM
Plans marked - pending engineer letter for soils and Footings.
6/4/2020 1:11:56 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/4/2020 1:11:56 PM
Plans marked. Pending engineer report for soils and Footings
6/4/2020 1:11:58 PM
Plans marked. Pending engineer letter for soils and Footings
6/4/2020 1:12:01 PM
Inspection voided by JWC.
6/4/2020 1:12:01 PM
Plans marked. Pending engineer letters
6/4/2020 1:12:03 PM
Plans marked. Pending engineer reports
6/4/2020 1:12:06 PM
Plans marked. Pending engineer letters
6/5/2020 1:26:06 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:06 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:07 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:07 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:07 PM
Plans marked. Pending engineer report for soils and Footings
6/5/2020 1:26:07 PM
Plans marked. Pending engineer letter for soils and Footings
6/5/2020 1:26:07 PM
Inspection voided by JWC.
6/5/2020 1:26:07 PM
Plans marked. Pending engineer letters
6/5/2020 1:26:07 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:08 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:08 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:08 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:09 PM
Plans marked. Pending engineer report for soils and Footings
6/5/2020 1:26:09 PM
Plans marked. Pending engineer letter for soils and Footings
6/5/2020 1:26:10 PM
Inspection voided by JWC.
6/5/2020 1:26:10 PM
Plans marked. Pending engineer letters
6/5/2020 1:26:10 PM
Plans marked. Pending engineer reports
6/5/2020 1:26:10 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:10 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:10 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:10 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:10 PM
Plans marked. Pending engineer report for soils and Footings
6/5/2020 1:26:10 PM
Plans marked. Pending engineer letter for soils and Footings
6/5/2020 1:26:11 PM
Inspection voided by JWC.
6/5/2020 1:26:11 PM
Plans marked. Pending engineer letters
6/5/2020 1:26:11 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:11 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:11 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:11 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:11 PM
Plans marked. Pending engineer report for soils and Footings
6/5/2020 1:26:11 PM
Plans marked. Pending engineer letter for soils and Footings
6/5/2020 1:26:12 PM
Inspection voided by JWC.
6/5/2020 1:26:12 PM
Plans marked. Pending engineer letters
6/5/2020 1:26:12 PM
Plans marked. Pending engineer reports
6/5/2020 1:26:12 PM
Plans marked. Pending engineer letters
6/5/2020 1:26:12 PM
Plans marked. Pending engineer reports
6/10/2020 9:54:43 AM
6/10/2020 9:54 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/12/2020 3:14:37 PM
Plans marked. Need to see canopy Footings. Pending 3rd party
engineer letters for soils, reinforcement and inspections.
Will need completed Engineer Acceptance Form completed along
with letters.
|
|
06/12/2020 | ELEC UNDERGROUND | DANA LAPISH | PARTIAL | | 6/11/2020 3:14:14 PM
1" conduit to sign north end and 1 1/4' & 1" to backflow devices south
end Marked on plans
6/11/2020 3:14:14 PM
Continuation of conduits to back flows and sign into Bldg.
Marked on plans
6/11/2020 3:14:14 PM
Conduits out to curb area for Future MRI and to procedure rooms from electrical room
6/11/2020 3:14:14 PM
Conduits runs from Elect. room to various areas Marked on plans
6/12/2020 3:41:48 PM
4"conduits for communications & continuation of others marked on plans South west corner
|
|
06/17/2020 | PLUMBING SLAB | DANA LAPISH | PARTIAL | | 6/11/2020 3:14:18 PM
Area east end DWV marked on plans
6/11/2020 3:14:18 PM
North-west end marked on plans
6/15/2020 1:33:24 PM
PEDULLA TRUCKING
6/17/2020 9:47:29 AM
DWV piping in north west area Marked on plans
|
|
06/17/2020 | ELEC UNDERGROUND | DANA LAPISH | PARTIAL | | 6/12/2020 3:41:51 PM
1" conduit to sign north end and 1 1/4' & 1" to backflow devices south
end Marked on plans
6/12/2020 3:41:52 PM
Continuation of conduits to back flows and sign into Bldg.
Marked on plans
6/12/2020 3:41:52 PM
Conduits out to curb area for Future MRI and to procedure rooms from electrical room
6/12/2020 3:41:52 PM
Conduits runs from Elect. room to various areas Marked on plans
6/12/2020 3:41:52 PM
4"conduits for communications & continuation of others marked on plans South west corner
6/17/2020 12:59:37 PM
conduit banks north west end & center area / Marked on plans
|
|
06/18/2020 | ELEC UNDERGROUND | DANA LAPISH | PARTIAL | | 6/17/2020 12:59:41 PM
1" conduit to sign north end and 1 1/4' & 1" to backflow devices south
end Marked on plans
6/17/2020 12:59:41 PM
Continuation of conduits to back flows and sign into Bldg.
Marked on plans
6/17/2020 12:59:41 PM
Conduits out to curb area for Future MRI and to procedure rooms from electrical room
6/17/2020 12:59:41 PM
Conduits runs from Elect. room to various areas Marked on plans
6/17/2020 12:59:41 PM
4"conduits for communications & continuation of others marked on plans South west corner
6/17/2020 12:59:41 PM
conduit banks north west end & center area / Marked on plans
6/18/2020 4:05:59 PM
Sign conduit to elect. room /2nd layer of conduit banks at south east corner /Additional conduits for future or spares Marked on plans
|
|
06/23/2020 | SLAB | JEFF CHUBY | PARTIAL | eTRAKiT Inspection Request | 6/22/2020 9:11:11 AM
6/22/2020 9:11 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/23/2020 11:00:53 AM
Plans marked.
|
|
06/23/2020 | ELEC UNDERGROUND | GRANT MILLER | PARTIAL | | 6/23/2020 11:07:59 AM
Service entrance.
|
|
06/24/2020 | ELEC UNDERGROUND | GRANT MILLER | PARTIAL | | 6/23/2020 11:08:15 AM
Service entrance.
|
|
06/25/2020 | ELEC UNDERGROUND | GRANT MILLER | PARTIAL | | 6/25/2020 2:44:30 PM
Floor boxes for lobby
|
|
06/25/2020 | SLAB | JEFF CHUBY | PARTIAL | eTRAKiT Inspection Request | 6/25/2020 1:19:27 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/25/2020 3:31:21 PM
Plans marked
|
|
06/25/2020 | SEWER | DANA LAPISH | APPROVED | | 6/25/2020 5:29:32 PM
Bldg. sewer connection at site sewer
|
|
06/25/2020 | PLUMBING ROUGH | DANA LAPISH | PARTIAL | Site sewer | 6/8/2020 2:55:19 PM
Site sewer starting at 1st manhole at end of Regency Rd. to
2nd. manhole running toward bldg.
6/8/2020 2:55:19 PM
Plumbing Consultation about site sewer & water lines
6/8/2020 2:55:19 PM
PM Please
6/8/2020 2:55:19 PM
Consultation with Plumbing Contractor
6/8/2020 2:55:19 PM
Sprinkler main underground
6/25/2020 5:34:43 PM
Complete site sewer run from 2nd manhole to bldg. /connection made to Bldg. sewer
|
|
06/26/2020 | ELEC UNDERGROUND | GRANT MILLER | PARTIAL | | 6/25/2020 2:44:35 PM
Floor boxes for lobby
6/26/2020 2:17:12 PM
Floor boxes for lobby set two.
|
|
06/29/2020 | PLUMBING SLAB | DANA LAPISH | PARTIAL | | 6/17/2020 9:47:33 AM
Area east end DWV marked on plans
6/17/2020 9:47:33 AM
North-west end marked on plans
6/17/2020 9:47:33 AM
DWV piping in north west area Marked on plans
6/17/2020 9:47:34 AM
PEDULLA TRUCKING
6/26/2020 5:23:23 PM
Men and Women O R Shower/Bathrooms and other associated DWV in area
Marked on plans
6/29/2020 10:25:23 AM
Southeast corner floor drains in boiler room area Marked on plans
|
|
| PLUMBING SLAB | DANA LAPISH | | | 6/29/2020 10:25:50 AM
Area east end DWV marked on plans
6/29/2020 10:25:50 AM
North-west end marked on plans
6/29/2020 10:25:50 AM
DWV piping in north west area Marked on plans
6/29/2020 10:25:51 AM
PEDULLA TRUCKING
6/29/2020 10:25:51 AM
Southeast corner floor drains in boiler room area Marked on plans
6/29/2020 10:25:51 AM
Men and Women O R Shower/Bathrooms and other associated DWV in area
Marked on plans
|
|
06/29/2020 | SLAB | JEFF CHUBY | PARTIAL | eTRAKiT Inspection Request | 6/23/2020 11:00:58 AM
Plans marked.
6/23/2020 11:00:58 AM
6/22/2020 9:11 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/23/2020 11:28:44 AM
6/23/2020 11:28 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/25/2020 3:31:25 PM
Plans marked
6/25/2020 3:31:25 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/25/2020 3:35:24 PM
Plans marked
6/29/2020 10:35:00 AM
Plans marked. Pending engineer letters
|
|
06/29/2020 | SLAB | JEFF CHUBY | PARTIAL | eTRAKiT Inspection Request | 6/25/2020 3:31:29 PM
Plans marked
6/25/2020 3:31:29 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/29/2020 10:35:12 AM
Plans marked.
6/29/2020 10:35:12 AM
6/22/2020 9:11 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/29/2020 10:35:12 AM
Plans marked
6/29/2020 10:35:12 AM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/29/2020 10:35:12 AM
Plans marked. Pending engineer letters
6/29/2020 10:35:12 AM
6/23/2020 11:28 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/29/2020 10:35:13 AM
Plans marked
6/29/2020 10:37:56 AM
Plans marked. Pending engineer letters
7/30/2020 1:28:38 PM
Plans marked
7/30/2020 1:28:38 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/30/2020 1:28:38 PM
Plans marked.
7/30/2020 1:28:39 PM
6/22/2020 9:11 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/30/2020 1:28:39 PM
Plans marked
7/30/2020 1:28:39 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/30/2020 1:28:39 PM
Plans marked. Pending engineer letters
7/30/2020 1:28:39 PM
6/23/2020 11:28 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/30/2020 1:28:39 PM
Plans marked
7/30/2020 1:28:39 PM
2nd floor. Plans marked. Pending 3rd party engineer letter
7/30/2020 1:28:39 PM
7/28/2020 2:15 PM CHOATE CONSTRUCTION COMPANY
2nd floor
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
|
|
07/01/2020 | WATER SUPPLY | DANA LAPISH | APPROVED | | 7/1/2020 10:04:24 AM
Bldg. main connected to site water /Test ok to connection
|
|
07/01/2020 | SLAB | GRANT MILLER | PARTIAL | eTRAKiT Inspection Request | 7/1/2020 3:51:23 PM
Partial slab, Electrical room side.
|
|
07/09/2020 | FOOTING | JEFF CHUBY | PARTIAL | | 6/4/2020 1:12:07 PM
Plans marked - pending engineer letter for soils and Footings.
6/4/2020 1:12:11 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/4/2020 1:12:11 PM
Plans marked - pending engineer letter for soils and Footings.
6/4/2020 1:12:12 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/4/2020 1:12:16 PM
Plans marked. Pending engineer report for soils and Footings
6/4/2020 1:12:17 PM
Plans marked. Pending engineer letter for soils and Footings
6/4/2020 1:12:17 PM
Inspection voided by JWC.
6/4/2020 1:12:20 PM
Plans marked. Pending engineer letters
6/4/2020 1:12:22 PM
Plans marked - pending engineer letter for soils and Footings.
6/4/2020 1:12:23 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/4/2020 1:12:23 PM
Plans marked - pending engineer letter for soils and Footings.
6/4/2020 1:12:23 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/4/2020 1:12:23 PM
Plans marked. Pending engineer report for soils and Footings
6/4/2020 1:12:23 PM
Plans marked. Pending engineer letter for soils and Footings
6/4/2020 1:12:23 PM
Inspection voided by JWC.
6/4/2020 1:12:23 PM
Plans marked. Pending engineer letters
6/4/2020 1:12:23 PM
Plans marked. Pending engineer reports
6/4/2020 1:12:23 PM
Plans marked. Pending engineer letters
6/5/2020 1:26:12 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:12 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:12 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:13 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:13 PM
Plans marked. Pending engineer report for soils and Footings
6/5/2020 1:26:13 PM
Plans marked. Pending engineer letter for soils and Footings
6/5/2020 1:26:13 PM
Inspection voided by JWC.
6/5/2020 1:26:13 PM
Plans marked. Pending engineer letters
6/5/2020 1:26:13 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:13 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:13 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:14 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:14 PM
Plans marked. Pending engineer report for soils and Footings
6/5/2020 1:26:14 PM
Plans marked. Pending engineer letter for soils and Footings
6/5/2020 1:26:14 PM
Inspection voided by JWC.
6/5/2020 1:26:14 PM
Plans marked. Pending engineer letters
6/5/2020 1:26:14 PM
Plans marked. Pending engineer reports
6/5/2020 1:26:14 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:14 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:15 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:15 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:15 PM
Plans marked. Pending engineer report for soils and Footings
6/5/2020 1:26:15 PM
Plans marked. Pending engineer letter for soils and Footings
6/5/2020 1:26:15 PM
Inspection voided by JWC.
6/5/2020 1:26:15 PM
Plans marked. Pending engineer letters
6/5/2020 1:26:15 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:15 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:16 PM
Plans marked - pending engineer letter for soils and Footings.
6/5/2020 1:26:16 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/5/2020 1:26:16 PM
Plans marked. Pending engineer report for soils and Footings
6/5/2020 1:26:16 PM
Plans marked. Pending engineer letter for soils and Footings
6/5/2020 1:26:16 PM
Inspection voided by JWC.
6/5/2020 1:26:16 PM
Plans marked. Pending engineer letters
6/5/2020 1:26:16 PM
Plans marked. Pending engineer reports
6/5/2020 1:26:16 PM
Plans marked. Pending engineer letters
6/5/2020 1:26:16 PM
Plans marked. Pending engineer reports
6/12/2020 3:14:51 PM
Plans marked - pending engineer letter for soils and Footings.
6/12/2020 3:14:51 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/12/2020 3:14:51 PM
Plans marked - pending engineer letter for soils and Footings.
6/12/2020 3:14:51 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/12/2020 3:14:52 PM
Plans marked. Pending engineer report for soils and Footings
6/12/2020 3:14:52 PM
Plans marked. Pending engineer letter for soils and Footings
6/12/2020 3:14:52 PM
Inspection voided by JWC.
6/12/2020 3:14:52 PM
Plans marked. Pending engineer letters
6/12/2020 3:14:52 PM
Plans marked. Pending engineer reports
6/12/2020 3:14:52 PM
Plans marked - pending engineer letter for soils and Footings.
6/12/2020 3:14:52 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/12/2020 3:14:52 PM
Plans marked - pending engineer letter for soils and Footings.
6/12/2020 3:14:52 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/12/2020 3:14:53 PM
Plans marked. Pending engineer report for soils and Footings
6/12/2020 3:14:53 PM
Plans marked. Pending engineer letter for soils and Footings
6/12/2020 3:14:53 PM
Inspection voided by JWC.
6/12/2020 3:14:53 PM
Plans marked. Pending engineer letters
6/12/2020 3:14:53 PM
Plans marked - pending engineer letter for soils and Footings.
6/12/2020 3:14:53 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/12/2020 3:14:53 PM
Plans marked - pending engineer letter for soils and Footings.
6/12/2020 3:14:53 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/12/2020 3:14:54 PM
Plans marked. Pending engineer report for soils and Footings
6/12/2020 3:14:54 PM
Plans marked. Pending engineer letter for soils and Footings
6/12/2020 3:14:54 PM
Inspection voided by JWC.
6/12/2020 3:14:54 PM
Plans marked. Pending engineer letters
6/12/2020 3:14:54 PM
Plans marked. Pending engineer reports
6/12/2020 3:14:54 PM
Plans marked. Pending engineer letters
6/12/2020 3:14:54 PM
Plans marked - pending engineer letter for soils and Footings.
6/12/2020 3:14:54 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/12/2020 3:14:54 PM
Plans marked - pending engineer letter for soils and Footings.
6/12/2020 3:14:55 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/12/2020 3:14:55 PM
Plans marked. Pending engineer report for soils and Footings
6/12/2020 3:14:55 PM
Plans marked. Pending engineer letter for soils and Footings
6/12/2020 3:14:55 PM
Inspection voided by JWC.
6/12/2020 3:14:55 PM
Plans marked. Pending engineer letters
6/12/2020 3:14:55 PM
Plans marked - pending engineer letter for soils and Footings.
6/12/2020 3:14:55 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/12/2020 3:14:55 PM
Plans marked - pending engineer letter for soils and Footings.
6/12/2020 3:14:55 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/12/2020 3:14:56 PM
Plans marked. Pending engineer report for soils and Footings
6/12/2020 3:14:56 PM
Plans marked. Pending engineer letter for soils and Footings
6/12/2020 3:14:56 PM
Inspection voided by JWC.
6/12/2020 3:14:56 PM
Plans marked. Pending engineer letters
6/12/2020 3:14:56 PM
Plans marked. Pending engineer reports
6/12/2020 3:14:56 PM
Plans marked - pending engineer letter for soils and Footings.
6/12/2020 3:14:56 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/12/2020 3:14:56 PM
Plans marked - pending engineer letter for soils and Footings.
6/12/2020 3:14:57 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/12/2020 3:14:57 PM
Plans marked. Pending engineer report for soils and Footings
6/12/2020 3:14:57 PM
Plans marked. Pending engineer letter for soils and Footings
6/12/2020 3:14:57 PM
Inspection voided by JWC.
6/12/2020 3:14:57 PM
Plans marked. Pending engineer letters
6/12/2020 3:14:57 PM
Plans marked - pending engineer letter for soils and Footings.
6/12/2020 3:14:57 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/12/2020 3:14:57 PM
Plans marked - pending engineer letter for soils and Footings.
6/12/2020 3:14:57 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
6/12/2020 3:14:58 PM
Plans marked. Pending engineer report for soils and Footings
6/12/2020 3:14:58 PM
Plans marked. Pending engineer letter for soils and Footings
6/12/2020 3:14:58 PM
Inspection voided by JWC.
6/12/2020 3:14:58 PM
Plans marked. Pending engineer letters
6/12/2020 3:14:58 PM
Plans marked. Pending engineer reports
6/12/2020 3:14:58 PM
Plans marked. Pending engineer letters
6/12/2020 3:14:58 PM
Plans marked. Pending engineer reports
6/12/2020 3:14:58 PM
Plans marked. Need to see canopy Footings. Pending 3rd party
engineer letters for soils, reinforcement and inspections.
Will need completed Engineer Acceptance Form completed along
with letters.
6/12/2020 3:14:59 PM
6/10/2020 9:54 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/8/2020 7:32:22 AM
7/8/2020 7:32 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/9/2020 3:15:13 PM
Remaining exterior column Footings. Pending 3rd party engineer letters
for soil bearing and inspection; Pending completion of Engineer
Acceptance Form along with the 3rd party engineer letters.
|
|
07/30/2020 | SLAB | JEFF CHUBY | PARTIAL | | 6/25/2020 3:31:27 PM
Plans marked
6/25/2020 3:31:27 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/29/2020 10:35:11 AM
Plans marked.
6/29/2020 10:35:11 AM
6/22/2020 9:11 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/29/2020 10:35:11 AM
Plans marked
6/29/2020 10:35:11 AM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/29/2020 10:35:11 AM
Plans marked. Pending engineer letters
6/29/2020 10:35:11 AM
6/23/2020 11:28 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/29/2020 10:35:12 AM
Plans marked
7/28/2020 2:15:53 PM
7/28/2020 2:15 PM CHOATE CONSTRUCTION COMPANY
2nd floor
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/30/2020 1:28:27 PM
2nd floor. Plans marked. Pending 3rd party engineer letter
|
|
08/04/2020 | SLAB | JEFF CHUBY | PARTIAL | eTRAKiT Inspection Request | 7/30/2020 1:28:46 PM
Plans marked
7/30/2020 1:28:46 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/30/2020 1:28:46 PM
Plans marked.
7/30/2020 1:28:47 PM
6/22/2020 9:11 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/30/2020 1:28:47 PM
Plans marked
7/30/2020 1:28:47 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/30/2020 1:28:47 PM
Plans marked. Pending engineer letters
7/30/2020 1:28:47 PM
6/23/2020 11:28 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/30/2020 1:28:47 PM
Plans marked
7/30/2020 1:28:47 PM
2nd floor. Plans marked. Pending 3rd party engineer letter
7/30/2020 1:28:47 PM
7/28/2020 2:15 PM CHOATE CONSTRUCTION COMPANY
2nd floor
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/3/2020 1:40:31 PM
8/3/2020 1:40 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/4/2020 3:16:37 PM
Plans marked. 2nd floor slab. Need to see last section of 2nd floor.
Pending 3rd party engineer letter
|
|
08/04/2020 | ELECTRICAL SLAB | GRANT MILLER | APPROVED | | |
|
| ELECTRICAL SLAB | GRANT MILLER | | | 6/5/2020 1:44:35 PM
Main conduit bank from electrical room to south end of Bldg.
Marked on plans
|
|
08/06/2020 | SLAB | JEFF CHUBY | PARTIAL | eTRAKiT Inspection Request | 6/29/2020 10:35:13 AM
Plans marked.
6/29/2020 10:35:13 AM
6/22/2020 9:11 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/29/2020 10:35:13 AM
Plans marked
6/29/2020 10:35:13 AM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/29/2020 10:35:13 AM
Plans marked. Pending engineer letters
6/29/2020 10:35:13 AM
6/23/2020 11:28 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
6/29/2020 10:35:13 AM
Plans marked
7/30/2020 1:28:42 PM
Plans marked
7/30/2020 1:28:42 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/30/2020 1:28:43 PM
Plans marked.
7/30/2020 1:28:43 PM
6/22/2020 9:11 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/30/2020 1:28:43 PM
Plans marked
7/30/2020 1:28:43 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/30/2020 1:28:43 PM
Plans marked. Pending engineer letters
7/30/2020 1:28:43 PM
6/23/2020 11:28 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/30/2020 1:28:43 PM
Plans marked
7/30/2020 1:28:43 PM
2nd floor. Plans marked. Pending 3rd party engineer letter
7/30/2020 1:28:43 PM
7/28/2020 2:15 PM CHOATE CONSTRUCTION COMPANY
2nd floor
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/4/2020 3:16:57 PM
Plans marked
8/4/2020 3:16:57 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/4/2020 3:16:57 PM
Plans marked.
8/4/2020 3:16:58 PM
6/22/2020 9:11 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/4/2020 3:16:58 PM
Plans marked
8/4/2020 3:16:58 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/4/2020 3:16:58 PM
Plans marked. Pending engineer letters
8/4/2020 3:16:58 PM
6/23/2020 11:28 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/4/2020 3:16:58 PM
Plans marked
8/4/2020 3:16:58 PM
2nd floor. Plans marked. Pending 3rd party engineer letter
8/4/2020 3:16:58 PM
7/28/2020 2:15 PM CHOATE CONSTRUCTION COMPANY
2nd floor
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/4/2020 3:16:58 PM
Plans marked. 2nd floor slab. Need to see last section of 2nd floor.
Pending 3rd party engineer letter
8/4/2020 3:16:59 PM
8/3/2020 1:40 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/5/2020 6:59:06 AM
8/5/2020 6:59 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:38 PM
Remaining 2nd floor decking. Pending copy of 3rd party engineer letter
|
|
08/13/2020 | FRAMING | JEFF CHUBY | PARTIAL | | 8/12/2020 10:04:04 AM
8/12/2020 10:04 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/13/2020 3:33:44 PM
Partial exterior walls. 1st and 2nd floor - plans marked
|
|
08/18/2020 | SAW SERVICE | GRANT MILLER | APPROVED | | 8/18/2020 9:38:13 AM
Saw service and temporary receptacles and LED lighting inside.
|
|
| SAW SERVICE | GRANT MILLER | | | 8/18/2020 9:38:20 AM
Saw service and temporary receptacles and LED lighting inside.
|
|
08/19/2020 | SHEATHING AND FLASHING | JEFF CHUBY | PARTIAL | | 8/19/2020 8:00:16 AM
8/19/2020 8:00 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/19/2020 10:03:10 AM
Discussed interior sheetrock on rated walls - okay to install where
adjoining walls meet rated walls so sheetrock is continuous. Okay
to sheetrock one side of interior walls.
|
|
08/19/2020 | ELEC UNDERGROUND | DANA LAPISH | PARTIAL | | 6/23/2020 11:08:19 AM
Service entrance.
6/25/2020 2:44:34 PM
Floor boxes for lobby
8/19/2020 11:31:22 AM
Remaining conduit to fire line backflows (power and alarm)
|
|
| ELEC UNDERGROUND | DANA LAPISH | | | 6/25/2020 2:44:35 PM
Floor boxes for lobby
8/19/2020 11:31:31 AM
Remaining conduit to fire line backflows (power and alarm)
8/19/2020 11:31:31 AM
Service entrance.
8/19/2020 11:31:31 AM
Floor boxes for lobby
|
|
08/19/2020 | PLUMBING ROUGH | DANA LAPISH | PARTIAL | | 8/19/2020 11:31:39 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
|
|
08/25/2020 | FRAMING | GRANT MILLER | PARTIAL | eTRAKiT Inspection Request | 8/13/2020 3:33:53 PM
Partial exterior walls. 1st and 2nd floor - plans marked
8/13/2020 3:33:53 PM
8/12/2020 10:04 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/24/2020 9:54:53 AM
8/24/2020 9:54 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/25/2020 4:32:48 PM
Interior framing. Column line 6-10.
|
|
09/11/2020 | SHEATHING AND FLASHING | JEFF CHUBY | PARTIAL | eTRAKiT Inspection Request | 8/19/2020 10:03:28 AM
Discussed interior sheetrock on rated walls - okay to install where
adjoining walls meet rated walls so sheetrock is continuous. Okay
to sheetrock one side of interior walls.
8/19/2020 10:03:28 AM
8/19/2020 8:00 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
9/9/2020 8:04:27 AM
9/9/2020 8:04 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
9/11/2020 12:33:10 PM
Remaining DensGlas. Pending exterior finish coat.
|
|
09/11/2020 | FRAMING | JEFF CHUBY | PARTIAL | eTRAKiT Inspection Request | 8/25/2020 4:32:54 PM
Interior framing. Column line 6-10.
8/25/2020 4:32:54 PM
Partial exterior walls. 1st and 2nd floor - plans marked
8/25/2020 4:32:55 PM
8/12/2020 10:04 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/25/2020 4:32:55 PM
8/24/2020 9:54 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
9/9/2020 8:04:00 AM
9/9/2020 8:04 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
9/11/2020 12:33:16 PM
Remaining exterior walls, elevator shaft liner and walls, IT and Electrical
Rooms. 1st and 2nd floor. Plans marked
|
|
09/21/2020 | FRAMING | GRANT MILLER | PARTIAL | eTRAKiT Inspection Request | 9/11/2020 12:33:19 PM
Interior framing. Column line 6-10.
9/11/2020 12:33:19 PM
Partial exterior walls. 1st and 2nd floor - plans marked
9/11/2020 12:33:19 PM
8/12/2020 10:04 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
9/11/2020 12:33:19 PM
8/24/2020 9:54 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
9/11/2020 12:33:19 PM
Remaining exterior walls, elevator shaft liner and walls, IT and Electrical
Rooms. 1st and 2nd floor. Plans marked
9/11/2020 12:33:19 PM
9/9/2020 8:04 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
9/18/2020 10:33:12 AM
9/18/2020 10:33 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
9/21/2020 11:31:59 PM
Interior faming.
|
|
09/24/2020 | PLUMBING ROUGH | DANA LAPISH | PARTIAL | Site sewer | 8/19/2020 11:31:50 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
9/24/2020 9:27:42 AM
Hose bibbs exterior walls marked on plans
|
|
09/28/2020 | ELECTRICAL ROUGH | GRANT MILLER | PARTIAL | | 9/25/2020 3:12:15 PM
9/25/2020 3:12 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
9/28/2020 2:21:26 PM
First floor partial.
|
|
09/29/2020 | INSULATION | JEFF CHUBY | PARTIAL | | 9/25/2020 3:16:56 PM
9/25/2020 3:16 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
9/29/2020 1:56:24 PM
1st floor exterior walls
|
|
09/30/2020 | MECHANICAL ROUGH | JEFF CHUBY | PARTIAL | A & B 1st floor duct seal. | 9/30/2020 10:10:15 AM
A & B 1st floor duct seal.
|
|
10/05/2020 | ELECTRICAL ROUGH | GRANT MILLER | APPROVED | | |
|
10/06/2020 | PLUMBING ROUGH | DANA LAPISH | PARTIAL | | 8/19/2020 11:31:50 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
9/24/2020 9:27:56 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
9/24/2020 9:27:57 AM
Hose bibbs exterior walls marked on plans
10/6/2020 2:36:05 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/6/2020 2:37:41 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
|
|
10/08/2020 | PLUMBING ROUGH | DANA LAPISH | PARTIAL | Site sewer | 9/24/2020 9:28:02 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
9/24/2020 9:28:03 AM
Hose bibbs exterior walls marked on plans
10/6/2020 2:38:01 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/6/2020 2:38:01 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/6/2020 2:38:01 PM
Hose bibbs exterior walls marked on plans
10/6/2020 2:38:01 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/6/2020 2:38:02 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/8/2020 12:35:33 PM
1st floor DWV in A section test through 2nd floor / marked on plans
|
|
10/09/2020 | FOUNDATION | GRANT MILLER | APPROVED | | 10/8/2020 4:43:37 PM
10/8/2020 4:43 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
10/9/2020 9:04:13 AM
Brick inspection. Flashing for weep holes and wall ties.
|
|
10/09/2020 | PLUMBING ROUGH | DANA LAPISH | PARTIAL | | 10/6/2020 2:38:02 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/6/2020 2:38:02 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/6/2020 2:38:02 PM
Hose bibbs exterior walls marked on plans
10/6/2020 2:38:02 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/6/2020 2:38:02 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/8/2020 12:35:46 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/8/2020 12:35:47 PM
Hose bibbs exterior walls marked on plans
10/8/2020 12:35:47 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/8/2020 12:35:47 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/8/2020 12:35:47 PM
Hose bibbs exterior walls marked on plans
10/8/2020 12:35:47 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/8/2020 12:35:47 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/8/2020 12:35:47 PM
1st floor DWV in A section test through 2nd floor / marked on plans
10/9/2020 3:56:47 PM
2 bathrooms 2nd floor DWV /marked on plans
|
|
10/12/2020 | ELECTRICAL ROUGH | GRANT MILLER | PARTIAL | | 9/28/2020 2:21:45 PM
First floor partial.
9/28/2020 2:21:45 PM
9/25/2020 3:12 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
10/12/2020 2:10:26 PM
Partial first and second floor wall rough.
|
|
10/12/2020 | PLUMBING ROUGH | DANA LAPISH | APPROVED | Site sewer | 10/8/2020 12:35:48 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/8/2020 12:35:48 PM
Hose bibbs exterior walls marked on plans
10/8/2020 12:35:48 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/8/2020 12:35:48 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/8/2020 12:35:48 PM
Hose bibbs exterior walls marked on plans
10/8/2020 12:35:48 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/8/2020 12:35:48 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/8/2020 12:35:48 PM
1st floor DWV in A section test through 2nd floor / marked on plans
10/9/2020 3:56:57 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/9/2020 3:56:57 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/9/2020 3:57:00 PM
Hose bibbs exterior walls marked on plans
10/9/2020 3:57:00 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/9/2020 3:57:00 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/9/2020 3:57:02 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/9/2020 3:57:03 PM
Hose bibbs exterior walls marked on plans
10/9/2020 3:57:03 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/9/2020 3:57:05 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/9/2020 3:57:06 PM
Hose bibbs exterior walls marked on plans
10/9/2020 3:57:07 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/9/2020 3:57:07 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/9/2020 3:57:07 PM
1st floor DWV in A section test through 2nd floor / marked on plans
10/9/2020 3:57:07 PM
2 bathrooms 2nd floor DWV /marked on plans
10/12/2020 4:18:46 PM
DWV in section A marked on plans and water lines
|
|
10/14/2020 | MECHANICAL ROUGH | GRANT MILLER | PARTIAL | A & B 1st floor duct seal. | 9/30/2020 10:10:33 AM
A & B 1st floor duct seal.
10/14/2020 2:01:32 PM
Partial duct seal, few ducts missed.
|
|
10/15/2020 | PLUMBING ROUGH | GRANT MILLER | PARTIAL | | 10/15/2020 6:02:07 PM
Partial second floor drainage and first floor venting.
|
|
10/20/2020 | PLUMBING ROUGH | DANA LAPISH | PARTIAL | | 10/9/2020 3:57:07 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/9/2020 3:57:07 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/9/2020 3:57:08 PM
Hose bibbs exterior walls marked on plans
10/9/2020 3:57:08 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/9/2020 3:57:08 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/9/2020 3:57:08 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/9/2020 3:57:08 PM
Hose bibbs exterior walls marked on plans
10/9/2020 3:57:08 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/9/2020 3:57:08 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/9/2020 3:57:08 PM
Hose bibbs exterior walls marked on plans
10/9/2020 3:57:08 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/9/2020 3:57:09 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/9/2020 3:57:09 PM
1st floor DWV in A section test through 2nd floor / marked on plans
10/9/2020 3:57:09 PM
2 bathrooms 2nd floor DWV /marked on plans
10/12/2020 4:19:04 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/12/2020 4:19:04 PM
Hose bibbs exterior walls marked on plans
10/12/2020 4:19:04 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/12/2020 4:19:05 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/12/2020 4:19:05 PM
Hose bibbs exterior walls marked on plans
10/12/2020 4:19:05 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/12/2020 4:19:06 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/12/2020 4:19:06 PM
1st floor DWV in A section test through 2nd floor / marked on plans
10/12/2020 4:19:07 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/12/2020 4:19:07 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/12/2020 4:19:07 PM
Hose bibbs exterior walls marked on plans
10/12/2020 4:19:08 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/12/2020 4:19:08 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/12/2020 4:19:08 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/12/2020 4:19:08 PM
Hose bibbs exterior walls marked on plans
10/12/2020 4:19:08 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/12/2020 4:19:09 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/12/2020 4:19:09 PM
Hose bibbs exterior walls marked on plans
10/12/2020 4:19:09 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/12/2020 4:19:09 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/12/2020 4:19:09 PM
1st floor DWV in A section test through 2nd floor / marked on plans
10/12/2020 4:19:10 PM
2 bathrooms 2nd floor DWV /marked on plans
10/12/2020 4:19:10 PM
DWV in section A marked on plans and water lines
10/20/2020 2:36:22 PM
DWV 3 sections / marked on plans
|
|
10/21/2020 | FOUNDATION | JEFF CHUBY | APPROVED | Dumpster enclosure areas | 10/21/2020 9:45:25 AM
Dumpster enclosure areas
|
|
10/21/2020 | FOUNDATION | JEFF CHUBY | APPROVED | | 10/21/2020 10:49:59 AM
Dumpster pad walls
|
|
10/22/2020 | PLUMBING ROUGH | DANA LAPISH | PARTIAL | | 10/20/2020 2:36:48 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/20/2020 2:36:48 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/20/2020 2:36:48 PM
Hose bibbs exterior walls marked on plans
10/20/2020 2:36:48 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/20/2020 2:36:49 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/20/2020 2:36:49 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/20/2020 2:36:49 PM
Hose bibbs exterior walls marked on plans
10/20/2020 2:36:49 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/20/2020 2:36:49 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/20/2020 2:36:49 PM
Hose bibbs exterior walls marked on plans
10/20/2020 2:36:49 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/20/2020 2:36:49 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/20/2020 2:36:50 PM
1st floor DWV in A section test through 2nd floor / marked on plans
10/20/2020 2:36:50 PM
2 bathrooms 2nd floor DWV /marked on plans
10/20/2020 2:36:50 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/20/2020 2:36:50 PM
Hose bibbs exterior walls marked on plans
10/20/2020 2:36:50 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/20/2020 2:36:50 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/20/2020 2:36:50 PM
Hose bibbs exterior walls marked on plans
10/20/2020 2:36:50 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/20/2020 2:36:50 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/20/2020 2:36:51 PM
1st floor DWV in A section test through 2nd floor / marked on plans
10/20/2020 2:36:51 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/20/2020 2:36:51 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/20/2020 2:36:51 PM
Hose bibbs exterior walls marked on plans
10/20/2020 2:36:51 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/20/2020 2:36:51 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/20/2020 2:36:51 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/20/2020 2:36:51 PM
Hose bibbs exterior walls marked on plans
10/20/2020 2:36:52 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/20/2020 2:36:52 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/20/2020 2:36:52 PM
Hose bibbs exterior walls marked on plans
10/20/2020 2:36:52 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/20/2020 2:36:52 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/20/2020 2:36:52 PM
1st floor DWV in A section test through 2nd floor / marked on plans
10/20/2020 2:36:52 PM
2 bathrooms 2nd floor DWV /marked on plans
10/20/2020 2:36:52 PM
DWV in section A marked on plans and water lines
10/20/2020 2:36:52 PM
DWV 3 sections / marked on plans
10/22/2020 7:54:31 AM
DWV stack and 2 vent sections Marked on plans
|
|
10/23/2020 | PLUMBING ROUGH | DANA LAPISH | PARTIAL | | 10/22/2020 7:54:58 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/22/2020 7:54:58 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/22/2020 7:54:58 AM
Hose bibbs exterior walls marked on plans
10/22/2020 7:54:58 AM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/22/2020 7:54:58 AM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/22/2020 7:54:58 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/22/2020 7:54:58 AM
Hose bibbs exterior walls marked on plans
10/22/2020 7:54:58 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/22/2020 7:54:58 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/22/2020 7:54:59 AM
Hose bibbs exterior walls marked on plans
10/22/2020 7:54:59 AM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/22/2020 7:54:59 AM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/22/2020 7:54:59 AM
1st floor DWV in A section test through 2nd floor / marked on plans
10/22/2020 7:54:59 AM
2 bathrooms 2nd floor DWV /marked on plans
10/22/2020 7:54:59 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/22/2020 7:54:59 AM
Hose bibbs exterior walls marked on plans
10/22/2020 7:54:59 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/22/2020 7:54:59 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/22/2020 7:55:00 AM
Hose bibbs exterior walls marked on plans
10/22/2020 7:55:00 AM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/22/2020 7:55:00 AM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/22/2020 7:55:00 AM
1st floor DWV in A section test through 2nd floor / marked on plans
10/22/2020 7:55:00 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/22/2020 7:55:00 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/22/2020 7:55:00 AM
Hose bibbs exterior walls marked on plans
10/22/2020 7:55:00 AM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/22/2020 7:55:00 AM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/22/2020 7:55:00 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/22/2020 7:55:01 AM
Hose bibbs exterior walls marked on plans
10/22/2020 7:55:01 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/22/2020 7:55:01 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/22/2020 7:55:01 AM
Hose bibbs exterior walls marked on plans
10/22/2020 7:55:01 AM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/22/2020 7:55:01 AM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/22/2020 7:55:01 AM
1st floor DWV in A section test through 2nd floor / marked on plans
10/22/2020 7:55:01 AM
2 bathrooms 2nd floor DWV /marked on plans
10/22/2020 7:55:01 AM
DWV in section A marked on plans and water lines
10/22/2020 7:55:02 AM
DWV 3 sections / marked on plans
10/22/2020 7:55:02 AM
DWV stack and 2 vent sections Marked on plans
10/23/2020 10:27:22 AM
DWV 1 drainage stack and 4 vent systems Marked on plans
|
|
10/26/2020 | ELECTRICAL ROUGH | GRANT MILLER | PARTIAL | | 10/12/2020 2:10:35 PM
First floor partial.
10/12/2020 2:10:36 PM
9/25/2020 3:12 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
10/12/2020 2:10:37 PM
Partial first and second floor wall rough.
10/19/2020 4:49:18 PM
2nd floor partial.
10/26/2020 4:01:54 PM
Second floor wall rough, first floor sheet rock soffits.
|
|
10/27/2020 | FRAMING | JEFF CHUBY | PARTIAL | eTRAKiT Inspection Request | 9/21/2020 11:32:12 PM
Interior faming.
9/21/2020 11:32:12 PM
Interior framing. Column line 6-10.
9/21/2020 11:32:13 PM
Partial exterior walls. 1st and 2nd floor - plans marked
9/21/2020 11:32:13 PM
8/12/2020 10:04 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
9/21/2020 11:32:13 PM
8/24/2020 9:54 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
9/21/2020 11:32:13 PM
Remaining exterior walls, elevator shaft liner and walls, IT and Electrical
Rooms. 1st and 2nd floor. Plans marked
9/21/2020 11:32:14 PM
9/9/2020 8:04 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
9/21/2020 11:32:14 PM
9/18/2020 10:33 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
10/26/2020 12:24:14 PM
10/26/2020 12:24 PM CHOATE CONSTRUCTION COMPANY
Second Floor Framing
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
10/27/2020 3:26:44 PM
2nd Floor
|
|
10/27/2020 | PLUMBING ROUGH | DANA LAPISH | PARTIAL | | 10/23/2020 10:27:57 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/23/2020 10:27:57 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/23/2020 10:27:57 AM
Hose bibbs exterior walls marked on plans
10/23/2020 10:27:57 AM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/23/2020 10:27:57 AM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/23/2020 10:27:57 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/23/2020 10:27:58 AM
Hose bibbs exterior walls marked on plans
10/23/2020 10:27:58 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/23/2020 10:27:58 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/23/2020 10:27:58 AM
Hose bibbs exterior walls marked on plans
10/23/2020 10:27:58 AM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/23/2020 10:27:59 AM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/23/2020 10:27:59 AM
1st floor DWV in A section test through 2nd floor / marked on plans
10/23/2020 10:27:59 AM
2 bathrooms 2nd floor DWV /marked on plans
10/23/2020 10:27:59 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/23/2020 10:27:59 AM
Hose bibbs exterior walls marked on plans
10/23/2020 10:27:59 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/23/2020 10:27:59 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/23/2020 10:28:00 AM
Hose bibbs exterior walls marked on plans
10/23/2020 10:28:00 AM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/23/2020 10:28:00 AM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/23/2020 10:28:00 AM
1st floor DWV in A section test through 2nd floor / marked on plans
10/23/2020 10:28:00 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/23/2020 10:28:00 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/23/2020 10:28:00 AM
Hose bibbs exterior walls marked on plans
10/23/2020 10:28:00 AM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/23/2020 10:28:01 AM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/23/2020 10:28:01 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/23/2020 10:28:01 AM
Hose bibbs exterior walls marked on plans
10/23/2020 10:28:01 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/23/2020 10:28:01 AM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/23/2020 10:28:02 AM
Hose bibbs exterior walls marked on plans
10/23/2020 10:28:03 AM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/23/2020 10:28:03 AM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/23/2020 10:28:03 AM
1st floor DWV in A section test through 2nd floor / marked on plans
10/23/2020 10:28:03 AM
2 bathrooms 2nd floor DWV /marked on plans
10/23/2020 10:28:03 AM
DWV in section A marked on plans and water lines
10/23/2020 10:28:03 AM
DWV 3 sections / marked on plans
10/23/2020 10:28:03 AM
DWV stack and 2 vent sections Marked on plans
10/23/2020 10:28:04 AM
DWV 1 drainage stack and 4 vent systems Marked on plans
10/26/2020 4:32:02 PM
Protect copper pipes through and against metal studs
10/27/2020 3:36:49 PM
DWV and Water lines complete on 1st floor Marked on plans
|
|
10/28/2020 | INSULATION | JEFF CHUBY | APPROVED | | 9/29/2020 1:56:28 PM
1st floor exterior walls
9/29/2020 1:56:28 PM
9/25/2020 3:16 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
10/27/2020 2:59:35 PM
10/27/2020 2:59 PM CHOATE CONSTRUCTION COMPANY
Second Floor exterior perimeter
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
|
|
10/28/2020 | PLUMBING ROUGH | DANA LAPISH | PARTIAL | IN WALL ROUGH | 10/28/2020 3:10:26 PM
2nd floor water lines in wall rough / marked on plans
|
|
11/02/2020 | PLUMBING ROUGH | DANA LAPISH | PARTIAL | | 10/27/2020 3:36:55 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/27/2020 3:36:55 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/27/2020 3:36:55 PM
Hose bibbs exterior walls marked on plans
10/27/2020 3:36:55 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/27/2020 3:36:55 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/27/2020 3:36:55 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/27/2020 3:36:56 PM
Hose bibbs exterior walls marked on plans
10/27/2020 3:36:56 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/27/2020 3:36:56 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/27/2020 3:36:56 PM
Hose bibbs exterior walls marked on plans
10/27/2020 3:36:56 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/27/2020 3:36:56 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/27/2020 3:36:56 PM
1st floor DWV in A section test through 2nd floor / marked on plans
10/27/2020 3:36:56 PM
2 bathrooms 2nd floor DWV /marked on plans
10/27/2020 3:36:56 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/27/2020 3:36:57 PM
Hose bibbs exterior walls marked on plans
10/27/2020 3:36:57 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/27/2020 3:36:57 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/27/2020 3:36:57 PM
Hose bibbs exterior walls marked on plans
10/27/2020 3:36:57 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/27/2020 3:36:57 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/27/2020 3:36:57 PM
1st floor DWV in A section test through 2nd floor / marked on plans
10/27/2020 3:36:58 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/27/2020 3:36:58 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/27/2020 3:36:58 PM
Hose bibbs exterior walls marked on plans
10/27/2020 3:36:58 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/27/2020 3:36:58 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/27/2020 3:36:58 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/27/2020 3:36:58 PM
Hose bibbs exterior walls marked on plans
10/27/2020 3:36:58 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/27/2020 3:36:58 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
10/27/2020 3:36:59 PM
Hose bibbs exterior walls marked on plans
10/27/2020 3:36:59 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
10/27/2020 3:36:59 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
10/27/2020 3:36:59 PM
1st floor DWV in A section test through 2nd floor / marked on plans
10/27/2020 3:36:59 PM
2 bathrooms 2nd floor DWV /marked on plans
10/27/2020 3:36:59 PM
DWV in section A marked on plans and water lines
10/27/2020 3:36:59 PM
DWV 3 sections / marked on plans
10/27/2020 3:36:59 PM
DWV stack and 2 vent sections Marked on plans
10/27/2020 3:37:00 PM
DWV 1 drainage stack and 4 vent systems Marked on plans
10/27/2020 3:37:00 PM
DWV and Water lines complete on 1st floor Marked on plans
10/27/2020 3:37:00 PM
Protect copper pipes through and against metal studs
11/2/2020 3:54:19 PM
3 vent systems with 3 vents through roof /Marked on plans
|
|
11/13/2020 | MECHANICAL ROUGH | GRANT MILLER | PARTIAL | A & B 1st floor duct seal. | 10/14/2020 2:01:46 PM
Partial duct seal, few ducts missed.
10/14/2020 2:01:47 PM
A & B 1st floor duct seal.
11/13/2020 2:23:29 PM
Duct seal second floor partial
|
|
11/13/2020 | PLUMBING ROUGH | GRANT MILLER | APPROVED | | 11/2/2020 3:54:24 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
11/2/2020 3:54:24 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
11/2/2020 3:54:24 PM
Hose bibbs exterior walls marked on plans
11/2/2020 3:54:24 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
11/2/2020 3:54:24 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
11/2/2020 3:54:24 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
11/2/2020 3:54:24 PM
Hose bibbs exterior walls marked on plans
11/2/2020 3:54:25 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
11/2/2020 3:54:25 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
11/2/2020 3:54:25 PM
Hose bibbs exterior walls marked on plans
11/2/2020 3:54:25 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
11/2/2020 3:54:25 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
11/2/2020 3:54:25 PM
1st floor DWV in A section test through 2nd floor / marked on plans
11/2/2020 3:54:25 PM
2 bathrooms 2nd floor DWV /marked on plans
11/2/2020 3:54:25 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
11/2/2020 3:54:26 PM
Hose bibbs exterior walls marked on plans
11/2/2020 3:54:26 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
11/2/2020 3:54:26 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
11/2/2020 3:54:26 PM
Hose bibbs exterior walls marked on plans
11/2/2020 3:54:26 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
11/2/2020 3:54:26 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
11/2/2020 3:54:26 PM
1st floor DWV in A section test through 2nd floor / marked on plans
11/2/2020 3:54:26 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
11/2/2020 3:54:26 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
11/2/2020 3:54:27 PM
Hose bibbs exterior walls marked on plans
11/2/2020 3:54:27 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
11/2/2020 3:54:27 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
11/2/2020 3:54:27 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
11/2/2020 3:54:27 PM
Hose bibbs exterior walls marked on plans
11/2/2020 3:54:27 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
11/2/2020 3:54:27 PM
Pedulla - site water Bldg. and irrigation from meter through backflows connection to site piping connection already made at bldg.
11/2/2020 3:54:27 PM
Hose bibbs exterior walls marked on plans
11/2/2020 3:54:27 PM
Front right corner roof drain and over flow tested up to 2nd floor/floor drain and three sinks all marked on plans
11/2/2020 3:54:28 PM
marked on plans Floor drain ,3 sinks and roof drain and over flow
11/2/2020 3:54:28 PM
1st floor DWV in A section test through 2nd floor / marked on plans
11/2/2020 3:54:28 PM
2 bathrooms 2nd floor DWV /marked on plans
11/2/2020 3:54:28 PM
DWV in section A marked on plans and water lines
11/2/2020 3:54:28 PM
DWV 3 sections / marked on plans
11/2/2020 3:54:30 PM
DWV stack and 2 vent sections Marked on plans
11/2/2020 3:54:30 PM
DWV 1 drainage stack and 4 vent systems Marked on plans
11/2/2020 3:54:30 PM
DWV and Water lines complete on 1st floor Marked on plans
11/2/2020 3:54:30 PM
Protect copper pipes through and against metal studs
11/2/2020 3:54:30 PM
3 vent systems with 3 vents through roof /Marked on plans
11/13/2020 2:23:48 PM
Second floor vent system.
|
|
11/13/2020 | BUILDING ABOVE CEILING | GRANT MILLER | PARTIAL | | 11/13/2020 9:55:35 PM
Fire stopping, penetrations through floor.
|
|
11/13/2020 | PLUMBING ROUGH | GRANT MILLER | APPROVED | IN WALL Remainder of level 2 | 11/13/2020 9:57:04 PM
Vent system..
|
|
11/23/2020 | ELECTRICAL ROUGH | GRANT MILLER | APPROVED | | 10/26/2020 4:01:59 PM
First floor partial.
10/26/2020 4:01:59 PM
9/25/2020 3:12 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
10/26/2020 4:01:59 PM
Partial first and second floor wall rough.
10/26/2020 4:01:59 PM
Second floor wall rough, first floor sheet rock soffits.
10/26/2020 4:01:59 PM
2nd floor partial.
11/23/2020 9:14:01 AM
Consult on temp power.
|
|
11/24/2020 | MECHANICAL ROUGH | GRANT MILLER | PARTIAL | A & B 1st floor duct seal. | 11/13/2020 2:23:36 PM
Partial duct seal, few ducts missed.
11/13/2020 2:23:36 PM
A & B 1st floor duct seal.
11/13/2020 2:23:36 PM
Duct seal second floor partial
11/24/2020 1:18:40 PM
Duct seal 2nd floor partial.
|
|
11/25/2020 | GAS PIPING ROUGH | GRANT MILLER | PARTIAL | | 11/30/2020 3:58:07 PM
Interior gas piping for boilers and up to roof top ok. That section was tested. Need to see test on piping coming into building and portion on roof.
11/30/2020 4:00:40 PM
Gas lines need to be labeled and will be check with above ceiling inspections.
|
|
11/25/2020 | MECHANICAL ROUGH | GRANT MILLER | PARTIAL | 1st floor hot water piping | 11/30/2020 3:59:30 PM
Hot water piping for first floor. Lines were labeled and insulated.
|
|
12/10/2020 | MECHANICAL ROUGH | JEFF CHUBY | PARTIAL | 2nd floor heating water | 12/10/2020 12:07:44 PM
Hydronic piping.
|
|
12/10/2020 | GAS PIPING ROUGH | JEFF CHUBY | APPROVED | | |
|
12/29/2020 | MECHANICAL ROUGH | GRANT MILLER | PARTIAL | 2nd floor DUCT SEAL | 12/29/2020 9:35:44 AM
Partial 2nd floor duct seal.
|
|
01/20/2021 | BUILDING ABOVE CEILING | JEFF CHUBY | INCOMPLETE | eTRAKiT Inspection Request | 1/18/2021 2:46:21 PM
1/18/2021 2:46 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
1/20/2021 2:18:17 PM
Entrances blocked - rear gate closed/locked and entrance near job trailer blocked by
semi-trucks - could not access. Fees owed.
|
|
01/27/2021 | TEMPORARY POWER | DANA LAPISH | APPROVED | | |
|
02/04/2021 | BUILDING ABOVE CEILING | JEFF CHUBY | PARTIAL | eTRAKiT Inspection Request | 1/26/2021 8:20:30 AM
1/26/2021 8:20 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
|
|
02/15/2021 | BUILDING ABOVE CEILING | GRANT MILLER | REJECTED | eTRAKiT Inspection Request | 2/11/2021 2:48:08 PM
2/11/2021 2:48 PM CHOATE CONSTRUCTION COMPANY
1st floor phase 3 and 4
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
2/15/2021 8:55:10 PM
Several junction boxes not made up.
2/15/2021 8:57:03 PM
Several penetrations need to be sealed.
|
|
02/15/2021 | ELEC ABOVE CEILING | GRANT MILLER | REJECTED | | 2/15/2021 8:58:26 PM
Several junction boxes not made up.
|
|
| ELEC ABOVE CEILING | | | | |
|
02/15/2021 | LOW VOLTAGE ROUGH | GRANT MILLER | APPROVED | CONVERGE COMM TECH | 2/12/2021 9:42:47 AM
ABOVE CEILING PHASE 3 AND 4
|
|
| ELECTRICAL ROUGH | GRANT MILLER | | | 11/23/2020 9:14:05 AM
First floor partial.
11/23/2020 9:14:06 AM
9/25/2020 3:12 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
11/23/2020 9:14:06 AM
Partial first and second floor wall rough.
11/23/2020 9:14:06 AM
Second floor wall rough, first floor sheet rock soffits.
11/23/2020 9:14:06 AM
2nd floor partial.
11/23/2020 9:14:06 AM
Consult on temp power.
|
|
02/17/2021 | BUILDING ABOVE CEILING | JEFF CHUBY | PARTIAL | eTRAKiT Inspection Request | 2/16/2021 2:03:54 PM
2/16/2021 2:03 PM CHOATE CONSTRUCTION COMPANY
1st floor Phase 3 and 4
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
2/17/2021 11:57:58 AM
First floor - Seal holes, penetrations and mud/tape rated walls. Remove stenciling from non-rated walls.
|
|
02/17/2021 | ELEC ABOVE CEILING | DANA LAPISH | PARTIAL | | 2/17/2021 3:50:06 PM
1st floor
|
|
| ELEC ABOVE CEILING | | | | |
|
02/17/2021 | PLUMBING ABOVE CEILING | DANA LAPISH | PARTIAL | | 2/17/2021 4:09:03 PM
1st floor
|
|
02/17/2021 | MECHANICAL ABOVE CEILING | DANA LAPISH | PARTIAL | | 2/17/2021 4:11:23 PM
1ST floor
|
|
02/19/2021 | ELEC ABOVE CEILING | GRANT MILLER | PARTIAL | | |
|
02/19/2021 | LOW VOLTAGE ROUGH | GRANT MILLER | APPROVED | WARDEN ENTERPRISE | 2/18/2021 2:26:56 PM
2nd Floor Above Ceiling Phase 1
|
|
02/19/2021 | LOW VOLTAGE ROUGH | GRANT MILLER | PARTIAL | 2ND FLOOR PHASE 1 CONVERGE | |
|
02/19/2021 | MECHANICAL ABOVE CEILING | JEFF CHUBY | PARTIAL | | 2/19/2021 2:35:04 PM
1st floor and phase 1 of 2nd floor okay.
|
|
02/19/2021 | PLUMBING ABOVE CEILING | JEFF CHUBY | PARTIAL | | 2/19/2021 2:35:17 PM
1st floor and phase 1 of 2nd floor okay.
|
|
02/19/2021 | BUILDING ABOVE CEILING | JEFF CHUBY | PARTIAL | eTRAKiT Inspection Request | 2/17/2021 12:21:23 PM
2/17/2021 12:21 PM CHOATE CONSTRUCTION COMPANY
Second floor phase 1
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
2/19/2021 2:35:21 PM
1st floor and phase 1 of 2nd floor okay.
|
|
02/26/2021 | MECHANICAL ABOVE CEILING | DANA LAPISH | PARTIAL | | 2/19/2021 2:35:16 PM
1st floor and phase 1 of 2nd floor okay.
2/26/2021 4:00:35 PM
2nd floor Phase 2
|
|
02/26/2021 | PLUMBING ABOVE CEILING | DANA LAPISH | PARTIAL | | 2/19/2021 2:35:21 PM
1st floor and phase 1 of 2nd floor okay.
2/26/2021 4:00:51 PM
2nd floor Phase 2
|
|
| PLUMBING ABOVE CEILING | DANA LAPISH | | | 2/26/2021 4:00:55 PM
2nd floor Phase 2
2/26/2021 4:00:55 PM
1st floor and phase 1 of 2nd floor okay.
|
|
02/26/2021 | ELEC ABOVE CEILING | GRANT MILLER | PARTIAL | | 2/26/2021 9:11:30 PM
Phase 2 section 2.
|
|
| ELEC ABOVE CEILING | | | | |
|
03/24/2021 | ELEC ABOVE CEILING | GRANT MILLER | APPROVED | | |
|
04/16/2021 | UTILITY FINAL | Gary L Harkey | APPROVED | per email from Maureen Gable | |
|
| TEMPORARY POWER | GRANT MILLER | | renew 3/29-5/29/2021 | |
|
04/22/2021 | BUILDING ABOVE CEILING | JEFF CHUBY | APPROVED | eTRAKiT Inspection Request | 2/19/2021 2:35:25 PM
1st floor and phase 1 of 2nd floor okay.
2/19/2021 2:35:25 PM
2/17/2021 12:21 PM CHOATE CONSTRUCTION COMPANY
Second floor phase 1
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
|
|
04/22/2021 | FOOTING | JEFF CHUBY | APPROVED | | 7/9/2020 3:15:44 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:44 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:44 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:44 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:45 PM
Plans marked. Pending engineer report for soils and Footings
7/9/2020 3:15:45 PM
Plans marked. Pending engineer letter for soils and Footings
7/9/2020 3:15:45 PM
Inspection voided by JWC.
7/9/2020 3:15:45 PM
Plans marked. Pending engineer letters
7/9/2020 3:15:45 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:45 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:45 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:45 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:45 PM
Plans marked. Pending engineer report for soils and Footings
7/9/2020 3:15:46 PM
Plans marked. Pending engineer letter for soils and Footings
7/9/2020 3:15:46 PM
Inspection voided by JWC.
7/9/2020 3:15:46 PM
Plans marked. Pending engineer letters
7/9/2020 3:15:46 PM
Plans marked. Pending engineer reports
7/9/2020 3:15:46 PM
Plans marked. Pending engineer letters
7/9/2020 3:15:46 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:46 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:46 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:46 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:47 PM
Plans marked. Pending engineer report for soils and Footings
7/9/2020 3:15:47 PM
Plans marked. Pending engineer letter for soils and Footings
7/9/2020 3:15:47 PM
Inspection voided by JWC.
7/9/2020 3:15:47 PM
Plans marked. Pending engineer letters
7/9/2020 3:15:47 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:47 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:47 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:47 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:48 PM
Plans marked. Pending engineer report for soils and Footings
7/9/2020 3:15:48 PM
Plans marked. Pending engineer letter for soils and Footings
7/9/2020 3:15:48 PM
Inspection voided by JWC.
7/9/2020 3:15:48 PM
Plans marked. Pending engineer letters
7/9/2020 3:15:48 PM
Plans marked. Pending engineer reports
7/9/2020 3:15:48 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:48 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:48 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:48 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:49 PM
Plans marked. Pending engineer report for soils and Footings
7/9/2020 3:15:49 PM
Plans marked. Pending engineer letter for soils and Footings
7/9/2020 3:15:49 PM
Inspection voided by JWC.
7/9/2020 3:15:49 PM
Plans marked. Pending engineer letters
7/9/2020 3:15:49 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:49 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:49 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:49 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:49 PM
Plans marked. Pending engineer report for soils and Footings
7/9/2020 3:15:50 PM
Plans marked. Pending engineer letter for soils and Footings
7/9/2020 3:15:50 PM
Inspection voided by JWC.
7/9/2020 3:15:50 PM
Plans marked. Pending engineer letters
7/9/2020 3:15:50 PM
Plans marked. Pending engineer reports
7/9/2020 3:15:50 PM
Plans marked. Pending engineer letters
7/9/2020 3:15:50 PM
Plans marked. Pending engineer reports
7/9/2020 3:15:50 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:50 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:50 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:51 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:51 PM
Plans marked. Pending engineer report for soils and Footings
7/9/2020 3:15:51 PM
Plans marked. Pending engineer letter for soils and Footings
7/9/2020 3:15:51 PM
Inspection voided by JWC.
7/9/2020 3:15:51 PM
Plans marked. Pending engineer letters
7/9/2020 3:15:51 PM
Plans marked. Pending engineer reports
7/9/2020 3:15:52 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:52 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:52 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:52 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:53 PM
Plans marked. Pending engineer report for soils and Footings
7/9/2020 3:15:53 PM
Plans marked. Pending engineer letter for soils and Footings
7/9/2020 3:15:54 PM
Inspection voided by JWC.
7/9/2020 3:15:54 PM
Plans marked. Pending engineer letters
7/9/2020 3:15:55 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:55 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:56 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:56 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:56 PM
Plans marked. Pending engineer report for soils and Footings
7/9/2020 3:15:57 PM
Plans marked. Pending engineer letter for soils and Footings
7/9/2020 3:15:57 PM
Inspection voided by JWC.
7/9/2020 3:15:58 PM
Plans marked. Pending engineer letters
7/9/2020 3:15:58 PM
Plans marked. Pending engineer reports
7/9/2020 3:15:58 PM
Plans marked. Pending engineer letters
7/9/2020 3:15:58 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:59 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:15:59 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:15:59 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:16:00 PM
Plans marked. Pending engineer report for soils and Footings
7/9/2020 3:16:00 PM
Plans marked. Pending engineer letter for soils and Footings
7/9/2020 3:16:01 PM
Inspection voided by JWC.
7/9/2020 3:16:01 PM
Plans marked. Pending engineer letters
7/9/2020 3:16:02 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:16:02 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:16:03 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:16:03 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:16:03 PM
Plans marked. Pending engineer report for soils and Footings
7/9/2020 3:16:03 PM
Plans marked. Pending engineer letter for soils and Footings
7/9/2020 3:16:03 PM
Inspection voided by JWC.
7/9/2020 3:16:04 PM
Plans marked. Pending engineer letters
7/9/2020 3:16:04 PM
Plans marked. Pending engineer reports
7/9/2020 3:16:04 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:16:04 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:16:04 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:16:04 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:16:04 PM
Plans marked. Pending engineer report for soils and Footings
7/9/2020 3:16:04 PM
Plans marked. Pending engineer letter for soils and Footings
7/9/2020 3:16:05 PM
Inspection voided by JWC.
7/9/2020 3:16:05 PM
Plans marked. Pending engineer letters
7/9/2020 3:16:05 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:16:05 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:16:05 PM
Plans marked - pending engineer letter for soils and Footings.
7/9/2020 3:16:05 PM
Plans marked. Pending engineer reports for soil and rebar/Footings
7/9/2020 3:16:05 PM
Plans marked. Pending engineer report for soils and Footings
7/9/2020 3:16:05 PM
Plans marked. Pending engineer letter for soils and Footings
7/9/2020 3:16:06 PM
Inspection voided by JWC.
7/9/2020 3:16:06 PM
Plans marked. Pending engineer letters
7/9/2020 3:16:06 PM
Plans marked. Pending engineer reports
7/9/2020 3:16:06 PM
Plans marked. Pending engineer letters
7/9/2020 3:16:06 PM
Plans marked. Pending engineer reports
7/9/2020 3:16:06 PM
Plans marked. Need to see canopy Footings. Pending 3rd party
engineer letters for soils, reinforcement and inspections.
Will need completed Engineer Acceptance Form completed along
with letters.
7/9/2020 3:16:06 PM
6/10/2020 9:54 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
7/9/2020 3:16:06 PM
Remaining exterior column Footings. Pending 3rd party engineer letters
for soil bearing and inspection; Pending completion of Engineer
Acceptance Form along with the 3rd party engineer letters.
7/9/2020 3:16:07 PM
7/8/2020 7:32 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
4/22/2021 11:04:39 AM
Engineer report on file.
|
|
04/22/2021 | FRAMING | JEFF CHUBY | APPROVED | eTRAKiT Inspection Request | 10/27/2020 3:27:06 PM
Interior faming.
10/27/2020 3:27:07 PM
Interior framing. Column line 6-10.
10/27/2020 3:27:07 PM
Partial exterior walls. 1st and 2nd floor - plans marked
10/27/2020 3:27:07 PM
8/12/2020 10:04 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
10/27/2020 3:27:07 PM
8/24/2020 9:54 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
10/27/2020 3:27:07 PM
Remaining exterior walls, elevator shaft liner and walls, IT and Electrical
Rooms. 1st and 2nd floor. Plans marked
10/27/2020 3:27:07 PM
9/9/2020 8:04 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
10/27/2020 3:27:07 PM
9/18/2020 10:33 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
10/27/2020 3:27:07 PM
2nd Floor
10/27/2020 3:27:08 PM
10/26/2020 12:24 PM CHOATE CONSTRUCTION COMPANY
Second Floor Framing
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
4/21/2021 1:21:49 PM
4/21/2021 1:21 PM CHOATE CONSTRUCTION COMPANY
Final
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
4/22/2021 11:05:18 AM
Engineer report on file.
|
|
04/22/2021 | SLAB | JEFF CHUBY | APPROVED | eTRAKiT Inspection Request | 8/4/2020 3:16:59 PM
Plans marked
8/4/2020 3:16:59 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/4/2020 3:16:59 PM
Plans marked.
8/4/2020 3:16:59 PM
6/22/2020 9:11 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/4/2020 3:16:59 PM
Plans marked
8/4/2020 3:17:00 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/4/2020 3:17:00 PM
Plans marked. Pending engineer letters
8/4/2020 3:17:00 PM
6/23/2020 11:28 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/4/2020 3:17:00 PM
Plans marked
8/4/2020 3:17:00 PM
2nd floor. Plans marked. Pending 3rd party engineer letter
8/4/2020 3:17:00 PM
7/28/2020 2:15 PM CHOATE CONSTRUCTION COMPANY
2nd floor
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/4/2020 3:17:00 PM
Plans marked. 2nd floor slab. Need to see last section of 2nd floor.
Pending 3rd party engineer letter
8/4/2020 3:17:00 PM
8/3/2020 1:40 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:43 PM
Plans marked.
8/6/2020 3:44:44 PM
6/22/2020 9:11 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:44 PM
Plans marked
8/6/2020 3:44:44 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:44 PM
Plans marked. Pending engineer letters
8/6/2020 3:44:44 PM
6/23/2020 11:28 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:44 PM
Plans marked
8/6/2020 3:44:44 PM
Plans marked
8/6/2020 3:44:44 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:44 PM
Plans marked.
8/6/2020 3:44:45 PM
6/22/2020 9:11 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:45 PM
Plans marked
8/6/2020 3:44:45 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:45 PM
Plans marked. Pending engineer letters
8/6/2020 3:44:45 PM
6/23/2020 11:28 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:45 PM
Plans marked
8/6/2020 3:44:45 PM
2nd floor. Plans marked. Pending 3rd party engineer letter
8/6/2020 3:44:45 PM
7/28/2020 2:15 PM CHOATE CONSTRUCTION COMPANY
2nd floor
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:46 PM
Plans marked
8/6/2020 3:44:46 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:46 PM
Plans marked.
8/6/2020 3:44:46 PM
6/22/2020 9:11 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:46 PM
Plans marked
8/6/2020 3:44:46 PM
6/25/2020 1:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:46 PM
Plans marked. Pending engineer letters
8/6/2020 3:44:46 PM
6/23/2020 11:28 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:46 PM
Plans marked
8/6/2020 3:44:47 PM
2nd floor. Plans marked. Pending 3rd party engineer letter
8/6/2020 3:44:47 PM
7/28/2020 2:15 PM CHOATE CONSTRUCTION COMPANY
2nd floor
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:47 PM
Plans marked. 2nd floor slab. Need to see last section of 2nd floor.
Pending 3rd party engineer letter
8/6/2020 3:44:47 PM
8/3/2020 1:40 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
8/6/2020 3:44:47 PM
Remaining 2nd floor decking. Pending copy of 3rd party engineer letter
8/6/2020 3:44:47 PM
8/5/2020 6:59 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
4/22/2021 11:06:32 AM
Engineer report on file.
|
|
04/22/2021 | SHEATHING AND FLASHING | JEFF CHUBY | APPROVED | eTRAKiT Inspection Request | 9/11/2020 12:33:15 PM
Discussed interior sheetrock on rated walls - okay to install where
adjoining walls meet rated walls so sheetrock is continuous. Okay
to sheetrock one side of interior walls.
9/11/2020 12:33:15 PM
8/19/2020 8:00 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
9/11/2020 12:33:15 PM
Remaining DensGlas. Pending exterior finish coat.
9/11/2020 12:33:15 PM
9/9/2020 8:04 AM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
4/21/2021 1:22:07 PM
4/21/2021 1:22 PM CHOATE CONSTRUCTION COMPANY
Final
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
4/22/2021 12:19:20 PM
Stucco Compliance Report on file.
|
|
| BACKFLOW | MARY A BOLIEK | APPROVED | | |
|
04/27/2021 | GAS PIPING FINAL | JEFF CHUBY | APPROVED | | |
|
04/27/2021 | MECHANICAL ABOVE CEILING | JEFF CHUBY | APPROVED | | 2/26/2021 4:00:51 PM
2nd floor Phase 2
2/26/2021 4:00:51 PM
1st floor and phase 1 of 2nd floor okay.
|
|
04/27/2021 | MECHANICAL ROUGH | JEFF CHUBY | APPROVED | 2nd floor DUCT SEAL | |
|
04/27/2021 | MECHANICAL FINAL CERT OF COMP | JEFF CHUBY | APPROVED | | |
|
04/27/2021 | ELECTRICAL FINAL CERT OF COMP | DANA LAPISH | PARTIAL | | 4/27/2021 11:47:05 AM
List left with contractor /complete all emergency lighting and exterior outlets, low voltage, missing switches, outlets and covers.
|
|
| ELECTRICAL FINAL CERT OF COMP | DANA LAPISH | | | 4/27/2021 11:47:12 AM
List left with contractor /complete all emergency lighting and exterior outlets, low voltage, missing switches, outlets and covers.
|
|
| ELECTRICAL FINAL CERT OF COMP | DANA LAPISH | | | 4/27/2021 11:47:11 AM
List left with contractor /complete all emergency lighting and exterior outlets, low voltage, missing switches, outlets and covers.
|
|
04/27/2021 | LOW VOLTAGE FINAL | DANA LAPISH | PARTIAL | CONVERGE COMM TECH | 4/27/2021 11:47:13 AM
Pending final walk through Friday
|
|
04/27/2021 | LOW VOLTAGE FINAL | DANA LAPISH | PARTIAL | ELECTRO SERVICES INC | 4/23/2021 4:04:51 PM
Contact Drew Berry with questions 704-837-5377. Mark Ice 704-635-1697 if needed.
4/27/2021 11:47:17 AM
Pending final walk through Friday
4/27/2021 11:47:18 AM
Pending final walk through Friday
|
|
04/27/2021 | PLUMBING FINAL CERT OF COMP | DANA LAPISH | APPROVED | | |
|
04/29/2021 | LOW VOLTAGE FINAL | GRANT MILLER | APPROVED | CONVERGE COMM TECH | |
|
04/29/2021 | LOW VOLTAGE FINAL | DANA LAPISH | APPROVED | EDWARDS ELECTRONIC SYSTEMS INC | 4/27/2021 11:47:17 AM
Pending final walk through Friday
4/27/2021 11:47:31 AM
Pending final walk through Friday
4/27/2021 11:47:31 AM
Pending final walk through Friday
4/27/2021 11:47:31 AM
Contact Drew Berry with questions 704-837-5377. Mark Ice 704-635-1697 if needed.
|
|
04/29/2021 | LOW VOLTAGE FINAL | GRANT MILLER | APPROVED | Warden Enterprise | 4/27/2021 11:47:16 AM
Pending final walk through Friday
4/27/2021 11:47:29 AM
Pending final walk through Friday
4/27/2021 11:47:29 AM
Pending final walk through Friday
4/27/2021 11:47:29 AM
Contact Drew Berry with questions 704-837-5377. Mark Ice 704-635-1697 if needed.
|
|
04/29/2021 | LOW VOLTAGE FINAL | GRANT MILLER | APPROVED | CONVERGE COMM TECH | 4/27/2021 11:47:18 AM
Pending final walk through Friday
4/27/2021 11:47:31 AM
Pending final walk through Friday
4/27/2021 11:47:32 AM
Pending final walk through Friday
4/27/2021 11:47:32 AM
Contact Drew Berry with questions 704-837-5377. Mark Ice 704-635-1697 if needed.
|
|
04/29/2021 | LOW VOLTAGE FINAL | GRANT MILLER | APPROVED | ELECTRO SERVICES INC | 4/27/2021 11:47:32 AM
Pending final walk through Friday
4/27/2021 11:47:33 AM
Pending final walk through Friday
4/27/2021 11:47:33 AM
Contact Drew Berry with questions 704-837-5377. Mark Ice 704-635-1697 if needed.
|
|
04/29/2021 | LOW VOLTAGE ROUGH | GRANT MILLER | APPROVED | ELECTRO SERVICES INC | |
|
04/29/2021 | LOW VOLTAGE ROUGH | GRANT MILLER | APPROVED | 2ND FLOOR PHASE 1 CONVERGE | |
|
04/29/2021 | LOW VOLTAGE ROUGH | GRANT MILLER | APPROVED | EDWARDS ELECTRONIC SYSTEMS INC | |
|
04/29/2021 | ELECTRICAL FINAL CERT OF COMP | GRANT MILLER | APPROVED | | |
|
04/30/2021 | BLDG FINAL CERT OF COMP | JEFF CHUBY | REJECTED | eTRAKiT Inspection Request | 4/27/2021 2:19:41 PM
4/27/2021 2:19 PM CHOATE CONSTRUCTION COMPANY
Contact Name: CHOATE CONSTRUCTION COMPANY
Site Address: 653 BLUEFIELD RD
Phone: 7045560550
e-Mail: emcclure@choateco.com
4/30/2021 3:28:52 PM
Need Mooresville Utility, Zoning and Fire approvals. Mark accessible parking and install accessible signage.
|
|
05/03/2021 | FIRE FINAL CERT OF COMP | Geoffrey R Woolard | APPROVED | | |
|
05/03/2021 | BLDG FINAL CERT OF COMP | JEFF CHUBY | REJECTED | eTRAKiT Inspection Request | 5/3/2021 3:01:52 PM
Need Mooresville Sewer and Water tap inspections; need Grading inspection approval.
|
|
05/03/2021 | WATER SUPPLY | DANA LAPISH | APPROVED | | |
|
| ZONING FINAL | MAUREEN GABLE | APPROVED | | |
|
05/03/2021 | GRADING COM | JONATHAN WILLIAMS | APPROVED | | |
|
05/03/2021 | BLDG FINAL CERT OF COMP | JEFF CHUBY | APPROVED | need CO as well | |
|
05/03/2021 | CERT OF OCCUPANCY | JEFF CHUBY | APPROVED | | |
|
05/03/2021 | COMPLETE PERMIT** | JEFF CHUBY | APPROVED | | |
|