| SLAB | | | | |
|
| GARAGE PORCH SLAB | | | | |
|
| SHOWER PAN | | | | |
|
01/28/2020 | SAW SERVICE | JACK HARWELL | APPROVED | | |
|
01/29/2020 | FOOTING | JEFF CHUBY | INCOMPLETE | | 1/29/2020 8:24:17 AM
CANCEL
|
|
01/29/2020 | GRADING RES | JEFF CHUBY | INCOMPLETE | | 1/29/2020 8:24:54 AM
CANCEL
|
|
01/29/2020 | LOCATION SETBACKS | JEFF CHUBY | INCOMPLETE | | 1/29/2020 8:24:58 AM
CANCEL
|
|
01/30/2020 | GRADING RES | BENTLEY PARLIER | REJECTED | | 1/29/2020 8:24:58 AM
CANCEL
1/30/2020 11:06:51 AM
Need stone down entering lot
|
|
| GRADING RES | BENTLEY PARLIER | | | 1/30/2020 11:06:59 AM
CANCEL
1/30/2020 11:06:59 AM
Need stone down entering lot
|
|
01/30/2020 | LOCATION SETBACKS | BENTLEY PARLIER | APPROVED | | 1/29/2020 8:25:02 AM
CANCEL
|
|
01/30/2020 | FOOTING | BENTLEY PARLIER | APPROVED | | 1/29/2020 8:24:53 AM
CANCEL
|
|
02/18/2020 | FRAMING | BENTLEY PARLIER | PARTIAL | | 2/18/2020 10:30:22 AM
Floor ok, need gravel on site entrance. Will need to seal between masonry and sill plate
|
|
02/18/2020 | FOUNDATION | BENTLEY PARLIER | APPROVED | | |
|
| PLUMBING SLAB | | | | |
|
04/17/2020 | MECHANICAL ROUGH | JACK HARWELL | APPROVED | eTRAKiT Inspection Request | 4/16/2020 12:30:25 PM
4/16/2020 12:30 PM CLIMATECH HEATING & COOLING INC
Contact Name: CLIMATECH HEATING & COOLING INC
Site Address: 135 SURFSIDE LN
Phone: 7044837343
e-Mail: teresa@climatechnc.com
|
|
04/17/2020 | GAS PIPING ROUGH | JACK HARWELL | APPROVED | eTRAKiT Inspection Request | 4/16/2020 12:29:48 PM
4/16/2020 12:29 PM CLIMATECH HEATING & COOLING INC
Contact Name: CLIMATECH HEATING & COOLING INC
Site Address: 135 SURFSIDE LN
Phone: 7044837343
e-Mail: teresa@climatechnc.com
|
|
| ELECTRICAL SLAB | | | | |
|
| SERVICE CHANGE | | | | |
|
| SERVICE RECONNECT | | | | |
|
| ELEC UNDERGROUND | | | | |
|
| ELEC ABOVE CEILING | | | | |
|
| SAW SERVICE | | | | |
|
04/22/2020 | SHEATHING AND FLASHING | JACK HARWELL | APPROVED | | |
|
| ELECTRICAL ROUGH | | | | |
|
04/23/2020 | ELECTRICAL ROUGH | JACK HARWELL | APPROVED | | |
|
04/23/2020 | SHEATHING AND FLASHING | JACK HARWELL | APPROVED | | |
|
04/23/2020 | FIREPLACE ROUGH | JEFF CHUBY | REJECTED | | 4/23/2020 10:37:25 AM
Maintain proper clearances from combustibles (install additional stand-off collars)
|
|
04/23/2020 | PLUMBING ROUGH | JEFF CHUBY | REJECTED | eTRAKiT Inspection Request | 4/22/2020 8:52:03 AM
4/22/2020 8:52 AM SERVICE PLUMBING OF CHARLOTTE INC
Contact Name: SERVICE PLUMBING OF CHARLOTTE INC
Site Address: 135 SURFSIDE LN
Phone: 7048958998
e-Mail: lhanson@serviceplumbing.net
4/23/2020 10:39:13 AM
Install missing nail guards at water lines; sleeve water lines through foundation; fire/rodent proof around tub drain
|
|
04/24/2020 | PLUMBING ROUGH | DANA LAPISH | APPROVED | eTRAKiT Inspection Request | |
|
04/24/2020 | LOW VOLTAGE ROUGH | DANA LAPISH | APPROVED | | |
|
04/24/2020 | FRAMING | DANA LAPISH | APPROVED | | 2/18/2020 10:30:36 AM
Floor ok, need gravel on site entrance. Will need to seal between masonry and sill plate
|
|
04/24/2020 | FIREPLACE ROUGH | DANA LAPISH | APPROVED | | |
|
04/28/2020 | INSULATION | MARK POPE | REJECTED | | 4/28/2020 5:21:00 PM
* clean dirt/debris off of & out of FP & chase * seal/foam all cracks & penetrations in dead chases * water lines on exterior wall need to be on heated side of insulation * *foam around windows @ stair platform & upstairs * install attic rulers * install insulation collar @ FP exhaust pipe * install air barrier behind tub/shower @ upper middle bath * install air barrier over insulation under stairs if not hanging sheetrock * * insulate upper floor @ side porch (heated room above ) *
|
|
| OPERATION | CARLA NICKS | APPROVED | | |
|
07/09/2020 | TEMPORARY POWER | GRANT MILLER | REJECTED | | 7/9/2020 1:28:54 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
|
|
07/10/2020 | TEMPORARY POWER | DANA LAPISH | APPROVED | | 7/9/2020 1:29:00 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
|
|
07/22/2020 | SEWER | JEFF CHUBY | APPROVED | | 7/21/2020 10:19:34 AM
7/21/2020 10:19 AM SERVICE PLUMBING OF CHARLOTTE INC
Contact Name: SERVICE PLUMBING OF CHARLOTTE INC
Site Address: 135 SURFSIDE LN
Phone: 7048958998
e-Mail: lhanson@serviceplumbing.net
|
|
07/22/2020 | WATER SUPPLY | JEFF CHUBY | APPROVED | eTRAKiT Inspection Request | 7/21/2020 10:20:10 AM
7/21/2020 10:20 AM SERVICE PLUMBING OF CHARLOTTE INC
Contact Name: SERVICE PLUMBING OF CHARLOTTE INC
Site Address: 135 SURFSIDE LN
Phone: 7048958998
e-Mail: lhanson@serviceplumbing.net
|
|
08/11/2020 | GAS PIPING ROUGH | DANA LAPISH | APPROVED | | 8/10/2020 4:56:33 PM
JAMES ERNEST SCAGLIONE
8/11/2020 3:24:57 PM
Underground piping from house at water heaters to LP tank in rear
Test ok
|
|
08/24/2020 | ELECTRICAL FINAL CERT OF COMP | JARRED CLINE | REJECTED | | 8/24/2020 1:59:42 PM
no one home
|
|
08/25/2020 | ELECTRICAL FINAL CERT OF COMP | GRANT MILLER | REJECTED | | 8/25/2020 3:32:25 PM
Wire light at crawl space unit. Need access to attic (attic stairs have not been cut to fit.)
Need Carbon monoxide detectors outside of bedroom areas. This may not be a complete list.
|
|
10/02/2020 | TEMPORARY POWER | DANA LAPISH | APPROVED | renew 8/13-10/13/2020 | 7/9/2020 1:29:00 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
7/10/2020 4:14:16 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
|
|
04/16/2021 | ELECTRICAL FINAL CERT OF COMP | DANA LAPISH | REJECTED | | 4/16/2021 3:28:44 PM
Need CO detectors on each level / light fixture installed under house and j-box cover
|
|
04/16/2021 | FIREPLACE FINAL | DANA LAPISH | APPROVED | | |
|
04/16/2021 | GAS PIPING FINAL | DANA LAPISH | APPROVED | | |
|
| GAS PIPING FINAL | DANA LAPISH | | | |
|
04/16/2021 | LOW VOLTAGE FINAL | DANA LAPISH | APPROVED | | |
|
04/16/2021 | MECHANICAL FINAL CERT OF COMP | DANA LAPISH | APPROVED | | |
|
04/16/2021 | PLUMBING FINAL CERT OF COMP | DANA LAPISH | APPROVED | | |
|
04/16/2021 | TEMPORARY POWER | DANA LAPISH | APPROVED | renew 2/13-6/13/2021 | 7/9/2020 1:29:00 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
7/10/2020 4:14:16 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
10/2/2020 2:05:58 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
10/2/2020 2:05:58 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
|
|
| TEMPORARY POWER | DANA LAPISH | | | 4/16/2021 3:29:13 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
4/16/2021 3:29:13 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
4/16/2021 3:29:13 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
4/16/2021 3:29:13 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
9/22/2021 12:36:33 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
9/22/2021 12:36:33 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
9/22/2021 12:36:33 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
9/22/2021 12:36:33 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
9/22/2021 12:36:33 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
9/22/2021 12:36:33 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
|
|
09/20/2021 | ELECTRICAL FINAL CERT OF COMP | DANA LAPISH | APPROVED | eTRAKiT Inspection Request | 4/16/2021 3:28:49 PM
Need CO detectors on each level / light fixture installed under house and j-box cover
9/17/2021 3:50:22 PM
9/17/2021 3:50 PM SCHMOLKE CONSTRUCTION INC
Contact Name: SCHMOLKE CONSTRUCTION INC
Site Address: 135 SURFSIDE LN
Phone: 5043881994
e-Mail: schmolkeconstruction@gmail.com
|
|
09/20/2021 | INSULATION | DANA LAPISH | APPROVED | eTRAKiT Inspection Request | 9/17/2021 3:50:41 PM
9/17/2021 3:50 PM SCHMOLKE CONSTRUCTION INC
Contact Name: SCHMOLKE CONSTRUCTION INC
Site Address: 135 SURFSIDE LN
Phone: 5043881994
e-Mail: schmolkeconstruction@gmail.com
|
|
09/20/2021 | INSULATION | DANA LAPISH | APPROVED | eTRAKiT Inspection Request | 4/28/2020 2:13:53 PM
* clean dirt/debris off of & in FP chase * seal/fire foam all crack/penetrations in dead chases * all water lines on exterior walls need to be on heated side of insulation * no foam around upstairs & stair platform windows * install attic rulers * install insulation collar @ FP vent pipe in attic * install air-barrier behind upstairs tub/shower & under stairs * insulate floor area @ side porch ( heated area above) *
9/17/2021 3:51:02 PM
9/17/2021 3:51 PM SCHMOLKE CONSTRUCTION INC
Contact Name: SCHMOLKE CONSTRUCTION INC
Site Address: 135 SURFSIDE LN
Phone: 5043881994
e-Mail: schmolkeconstruction@gmail.com
9/20/2021 3:37:48 PM
9/17/2021 3:50 PM SCHMOLKE CONSTRUCTION INC
Contact Name: SCHMOLKE CONSTRUCTION INC
Site Address: 135 SURFSIDE LN
Phone: 5043881994
e-Mail: schmolkeconstruction@gmail.com
|
|
09/22/2021 | TEMPORARY POWER | DANA LAPISH | APPROVED | renew 6/13-10/13/2021 | 10/2/2020 2:05:58 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
10/2/2020 2:05:58 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
4/16/2021 3:29:13 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
4/16/2021 3:29:13 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
4/16/2021 3:29:13 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
4/16/2021 3:29:13 PM
Label both panels.
Need 4-wire feeder to sub-panel.
Separate neutral and ground conductors.
Strap ground wire to foundation.
Install utility ground point on ground wire.
|
|
09/23/2021 | BLDG FINAL CERT OF COMP | DANA LAPISH | APPROVED | | |
|
09/23/2021 | CERT OF OCCUPANCY | DANA LAPISH | APPROVED | | |
|
09/23/2021 | COMPLETE PERMIT** | DANA LAPISH | APPROVED | | |
|