01/07/2020 | FOOTING | JEFF CHUBY | APPROVED | HAS LETTER | 1/7/2020 10:09:24 AM
put in box
1/7/2020 10:11:14 AM
can do saw service, location setback and grading with this. They are scheduled for tomorrow.
1/7/2020 12:57:18 PM
Engineer report and engineer compliance report for inspection on file. Soil report on file.
|
|
01/07/2020 | FOUNDATION | JEFF CHUBY | APPROVED | WATER PROOFING ALSO | |
|
01/07/2020 | FOUNDATION | JEFF CHUBY | APPROVED | TERMITE CONTROL | |
|
01/07/2020 | GRADING RES | JEFF CHUBY | PARTIAL | | 1/7/2020 12:57:26 PM
Pending Final grade
|
|
01/07/2020 | LOCATION SETBACKS | JEFF CHUBY | APPROVED | | 1/7/2020 12:57:30 PM
Property lines flagged
|
|
01/07/2020 | SAW SERVICE | JACK HARWELL | APPROVED | | |
|
01/14/2020 | FRAMING | MARK POPE | PARTIAL | | 1/14/2020 10:34:20 AM
* open floor /OK *
|
|
01/30/2020 | SLAB | BRADLEY NICHOLSON | APPROVED | PORCH & GARAGE SLAB | 1/30/2020 12:59:48 PM
Garage, front & rear porches ok
|
|
02/03/2020 | PLUMBING ROUGH | MARK POPE | APPROVED | | |
|
02/14/2020 | ELECTRICAL ROUGH | BRADLEY NICHOLSON | APPROVED | | |
|
02/14/2020 | MECHANICAL ROUGH | BRADLEY NICHOLSON | REJECTED | | 2/14/2020 9:54:55 AM
not ready
|
|
02/14/2020 | FRAMING | BRADLEY NICHOLSON | REJECTED | | 1/14/2020 10:34:28 AM
* open floor /OK *
2/14/2020 9:55:01 AM
need all trade rough approvals, add staps on each side of header at master bedroom window,double stapping at garage portal frame
|
|
02/14/2020 | LOW VOLTAGE ROUGH | BRADLEY NICHOLSON | APPROVED | | |
|
02/17/2020 | SHEATHING AND FLASHING | BRADLEY NICHOLSON | APPROVED | | |
|
02/17/2020 | MECHANICAL ROUGH | BRADLEY NICHOLSON | APPROVED | | 2/14/2020 9:55:00 AM
not ready
|
|
02/17/2020 | FRAMING | BRADLEY NICHOLSON | APPROVED | | 2/14/2020 9:55:07 AM
need all trade rough approvals, add staps on each side of header at master bedroom window,double stapping at garage portal frame
2/14/2020 9:55:08 AM
* open floor /OK *
|
|
02/17/2020 | GAS PIPING ROUGH | BRADLEY NICHOLSON | APPROVED | | |
|
02/20/2020 | INSULATION | BRADLEY NICHOLSON | PARTIAL | | 2/20/2020 2:44:34 PM
Pending seal around frame on front door, complete wall insulation by same door
|
|
02/21/2020 | INSULATION | BRADLEY NICHOLSON | APPROVED | | 2/20/2020 2:44:39 PM
Pending seal around frame on front door, complete wall insulation by same door
|
|
03/16/2020 | OPERATION | MARIA DOTSON | APPROVED | | |
|
| OPERATION | MARIA DOTSON | APPROVED | | |
|
03/16/2020 | SHOWER PAN | MARK POPE | APPROVED | | 3/16/2020 4:07:14 PM
* master shower *
|
|
03/30/2020 | ELEC UNDERGROUND | DANA LAPISH | APPROVED | | 3/30/2020 2:46:59 PM
well
|
|
03/30/2020 | TEMPORARY POWER | DANA LAPISH | APPROVED | | |
|
04/08/2020 | PLUMBING FINAL CERT OF COMP | MARK POPE | REJECTED | | 4/8/2020 12:02:56 PM
* install pipe @ pop off valve @ W/H * insulate water lines @ W/H * complete set out of half bath * seal annular space @ sewer sleeve inside of crawlspace, also seal foundation wall @ sewer sleeve inside of crawlspace * water supply never inspected. need to see depth @ several locations *
|
|
04/08/2020 | SEWER | MARK POPE | APPROVED | | |
|
04/08/2020 | WATER SUPPLY | MARK POPE | REJECTED | | 4/8/2020 12:03:03 PM
* water supply never inspected. need to see depth @ several location *
|
|
04/14/2020 | MECHANICAL FINAL CERT OF COMP | DANA LAPISH | APPROVED | | 2/17/2020 9:49:49 AM
check return ducts at final, not installed on rough
|
|
04/14/2020 | PLUMBING FINAL CERT OF COMP | DANA LAPISH | APPROVED | | 4/8/2020 12:03:00 PM
* install pipe @ pop off valve @ W/H * insulate water lines @ W/H * complete set out of half bath * seal annular space @ sewer sleeve inside of crawlspace, also seal foundation wall @ sewer sleeve inside of crawlspace * water supply never inspected. need to see depth @ several locations *
|
|
04/14/2020 | WATER SUPPLY | DANA LAPISH | APPROVED | | 4/8/2020 12:03:31 PM
* water supply never inspected. need to see depth @ several location *
4/14/2020 11:10:40 AM
Inspected at same time Electrical well underground
|
|
04/14/2020 | GAS PIPING FINAL | DANA LAPISH | REJECTED | | 4/14/2020 11:10:34 AM
Need to disconnect gas & test gas piping again at final / Regulator installed in attic is gas pressure
2LB. or 1/2lb. Install proper regulators if 2LB.system
|
|
04/14/2020 | ELECTRICAL FINAL CERT OF COMP | DANA LAPISH | REJECTED | | 4/14/2020 11:28:45 AM
Bond gas piping when using Trac piping
|
|
04/14/2020 | BLDG FINAL CERT OF COMP | DANA LAPISH | REJECTED | | 4/14/2020 1:23:54 PM
Need Energy Certificate & Duct leakage test/ All health dept. inspections need to be approved & entered into system / Install house numbers
|
|
04/17/2020 | BLDG FINAL CERT OF COMP | DANA LAPISH | REJECTED | | 4/14/2020 1:23:57 PM
Need Energy Certificate & Duct leakage test/ All health dept. inspections need to be approved & entered into system / Install house numbers
4/17/2020 1:30:07 PM
Same as last visit
|
|
04/17/2020 | ELECTRICAL FINAL CERT OF COMP | DANA LAPISH | REJECTED | | 4/17/2020 5:08:54 PM
Need to bond CSST gas piping
|
|
04/17/2020 | GAS PIPING FINAL | DANA LAPISH | REJECTED | | 4/17/2020 5:15:26 PM
Need Test at final / verify gas supply 1/2lb. or 2lb. & label & install regulators if needed
|
|
04/21/2020 | GW-1 | MARIA DOTSON | APPROVED | | |
|
11/19/2019 | WELL ABANDONMENT | PATRICK BOYLE | APPROVED | | 11/13/2019 1:27:57 PM
Could not enter Date in box but abandonment was done on 11/13/19
|
|
03/11/2020 | WELL GROUTING | JAMES BOGGS | APPROVED | Passed 3-11-2020 | |
|
04/22/2020 | WELL HEAD | BEN BOTKINS | APPROVED | APPROVED BY BB | |
|
04/22/2020 | ELECTRICAL FINAL CERT OF COMP | DANA LAPISH | APPROVED | | |
|
04/22/2020 | GAS PIPING FINAL | DANA LAPISH | APPROVED | | |
|
| GRADING RES | DANA LAPISH | APPROVED | | 1/7/2020 12:57:29 PM
Pending Final grade
|
|
| LOW VOLTAGE FINAL | DANA LAPISH | APPROVED | | |
|
04/22/2020 | BLDG FINAL CERT OF COMP | DANA LAPISH | APPROVED | | 4/17/2020 1:30:11 PM
Need Energy Certificate & Duct leakage test/ All health dept. inspections need to be approved & entered into system / Install house numbers
4/17/2020 1:30:11 PM
Same as last visit
|
|
| CERT OF OCCUPANCY | DANA LAPISH | APPROVED | | |
|
| ENERGY ENVELOPE | DANA LAPISH | APPROVED | | |
|
| COMPLETE PERMIT** | DANA LAPISH | APPROVED | | |
|