ELECTRICAL SLAB

PLUMBING SLAB

CHANGE OF USE

TEMPORARY OCCUPANCY

GARAGE PORCH SLAB

MARRIAGE WALL

OPEN FLOOR FRAMING

BUILDING ABOVE CEILING

COMPLETE PERMIT**

 01/07/2020FOOTINGJEFF CHUBYAPPROVEDHAS LETTER1/7/2020 10:09:24 AM put in box 1/7/2020 10:11:14 AM can do saw service, location setback and grading with this. They are scheduled for tomorrow. 1/7/2020 12:57:18 PM Engineer report and engineer compliance report for inspection on file. Soil report on file.

 01/07/2020FOUNDATIONJEFF CHUBYAPPROVEDWATER PROOFING ALSO

 01/07/2020FOUNDATIONJEFF CHUBYAPPROVEDTERMITE CONTROL

 01/07/2020GRADING RESJEFF CHUBYPARTIAL1/7/2020 12:57:26 PM Pending Final grade

 01/07/2020LOCATION SETBACKSJEFF CHUBYAPPROVED1/7/2020 12:57:30 PM Property lines flagged

 01/07/2020SAW SERVICEJACK HARWELLAPPROVED

 01/14/2020FRAMINGMARK POPEPARTIAL1/14/2020 10:34:20 AM * open floor /OK *

 01/30/2020SLABBRADLEY NICHOLSONAPPROVEDPORCH & GARAGE SLAB1/30/2020 12:59:48 PM Garage, front & rear porches ok

 02/03/2020PLUMBING ROUGHMARK POPEAPPROVED

 02/14/2020ELECTRICAL ROUGHBRADLEY NICHOLSONAPPROVED

 02/14/2020MECHANICAL ROUGHBRADLEY NICHOLSONREJECTED2/14/2020 9:54:55 AM not ready

 02/14/2020FRAMINGBRADLEY NICHOLSONREJECTED1/14/2020 10:34:28 AM * open floor /OK * 2/14/2020 9:55:01 AM need all trade rough approvals, add staps on each side of header at master bedroom window,double stapping at garage portal frame

 02/14/2020LOW VOLTAGE ROUGHBRADLEY NICHOLSONAPPROVED

 02/17/2020SHEATHING AND FLASHINGBRADLEY NICHOLSONAPPROVED

 02/17/2020MECHANICAL ROUGHBRADLEY NICHOLSONAPPROVED2/14/2020 9:55:00 AM not ready

 02/17/2020FRAMINGBRADLEY NICHOLSONAPPROVED2/14/2020 9:55:07 AM need all trade rough approvals, add staps on each side of header at master bedroom window,double stapping at garage portal frame 2/14/2020 9:55:08 AM * open floor /OK *

 02/17/2020GAS PIPING ROUGHBRADLEY NICHOLSONAPPROVED

 02/20/2020INSULATIONBRADLEY NICHOLSONPARTIAL2/20/2020 2:44:34 PM Pending seal around frame on front door, complete wall insulation by same door

 02/21/2020INSULATIONBRADLEY NICHOLSONAPPROVED2/20/2020 2:44:39 PM Pending seal around frame on front door, complete wall insulation by same door

 03/16/2020OPERATIONMARIA DOTSONAPPROVED

OPERATIONMARIA DOTSONAPPROVED

 03/16/2020SHOWER PANMARK POPEAPPROVED3/16/2020 4:07:14 PM * master shower *

 03/30/2020ELEC UNDERGROUNDDANA LAPISHAPPROVED3/30/2020 2:46:59 PM well

 03/30/2020TEMPORARY POWERDANA LAPISHAPPROVED

 04/08/2020PLUMBING FINAL CERT OF COMPMARK POPEREJECTED4/8/2020 12:02:56 PM * install pipe @ pop off valve @ W/H * insulate water lines @ W/H * complete set out of half bath * seal annular space @ sewer sleeve inside of crawlspace, also seal foundation wall @ sewer sleeve inside of crawlspace * water supply never inspected. need to see depth @ several locations *

 04/08/2020SEWERMARK POPEAPPROVED

 04/08/2020WATER SUPPLYMARK POPEREJECTED4/8/2020 12:03:03 PM * water supply never inspected. need to see depth @ several location *

 04/14/2020MECHANICAL FINAL CERT OF COMPDANA LAPISHAPPROVED2/17/2020 9:49:49 AM check return ducts at final, not installed on rough

 04/14/2020PLUMBING FINAL CERT OF COMPDANA LAPISHAPPROVED4/8/2020 12:03:00 PM * install pipe @ pop off valve @ W/H * insulate water lines @ W/H * complete set out of half bath * seal annular space @ sewer sleeve inside of crawlspace, also seal foundation wall @ sewer sleeve inside of crawlspace * water supply never inspected. need to see depth @ several locations *

 04/14/2020WATER SUPPLYDANA LAPISHAPPROVED4/8/2020 12:03:31 PM * water supply never inspected. need to see depth @ several location * 4/14/2020 11:10:40 AM Inspected at same time Electrical well underground

 04/14/2020GAS PIPING FINALDANA LAPISHREJECTED4/14/2020 11:10:34 AM Need to disconnect gas & test gas piping again at final / Regulator installed in attic is gas pressure 2LB. or 1/2lb. Install proper regulators if 2LB.system

 04/14/2020ELECTRICAL FINAL CERT OF COMPDANA LAPISHREJECTED4/14/2020 11:28:45 AM Bond gas piping when using Trac piping

 04/14/2020BLDG FINAL CERT OF COMPDANA LAPISHREJECTED4/14/2020 1:23:54 PM Need Energy Certificate & Duct leakage test/ All health dept. inspections need to be approved & entered into system / Install house numbers

 04/17/2020BLDG FINAL CERT OF COMPDANA LAPISHREJECTED4/14/2020 1:23:57 PM Need Energy Certificate & Duct leakage test/ All health dept. inspections need to be approved & entered into system / Install house numbers 4/17/2020 1:30:07 PM Same as last visit

 04/17/2020ELECTRICAL FINAL CERT OF COMPDANA LAPISHREJECTED4/17/2020 5:08:54 PM Need to bond CSST gas piping

 04/17/2020GAS PIPING FINALDANA LAPISHREJECTED4/17/2020 5:15:26 PM Need Test at final / verify gas supply 1/2lb. or 2lb. & label & install regulators if needed

 04/21/2020GW-1MARIA DOTSONAPPROVED

 11/19/2019WELL ABANDONMENTPATRICK BOYLEAPPROVED11/13/2019 1:27:57 PM Could not enter Date in box but abandonment was done on 11/13/19

 03/11/2020WELL GROUTINGJAMES BOGGSAPPROVEDPassed 3-11-2020

 04/22/2020WELL HEADBEN BOTKINSAPPROVEDAPPROVED BY BB

 04/22/2020ELECTRICAL FINAL CERT OF COMPDANA LAPISHAPPROVED

 04/22/2020GAS PIPING FINALDANA LAPISHAPPROVED

GRADING RESDANA LAPISHAPPROVED1/7/2020 12:57:29 PM Pending Final grade

LOW VOLTAGE FINALDANA LAPISHAPPROVED

 04/22/2020BLDG FINAL CERT OF COMPDANA LAPISHAPPROVED4/17/2020 1:30:11 PM Need Energy Certificate & Duct leakage test/ All health dept. inspections need to be approved & entered into system / Install house numbers 4/17/2020 1:30:11 PM Same as last visit

CERT OF OCCUPANCYDANA LAPISHAPPROVED

ENERGY ENVELOPEDANA LAPISHAPPROVED

COMPLETE PERMIT**DANA LAPISHAPPROVED

WELL WATER SAMPLE