| INSULATION | | | | |
|
| BLDG FINAL CERT OF COMP | | | | |
|
| LOW VOLTAGE ROUGH | | | | |
|
| LOW VOLTAGE FINAL | | | | |
|
02/25/2020 | ELECTRICAL ROUGH | DARIN OXENTINE | PARTIAL | | 2/25/2020 1:11:55 PM
2nd floor wall rough
|
|
02/25/2020 | FRAMING | DARIN OXENTINE | PARTIAL | | 2/25/2020 1:13:02 PM
2nd floor metal stud walls
|
|
03/03/2020 | PLUMBING SLAB | RICK CLINE | PARTIAL | | 3/3/2020 8:26:16 AM
drain connection under the awning
|
|
03/03/2020 | PLUMBING ROUGH | RICK CLINE | INCOMPLETE | | 3/3/2020 8:26:59 AM
wrong inspection requested
|
|
03/03/2020 | PLUMBING ROUGH | RICK CLINE | REJECTED | | 3/3/2020 1:51:14 PM
wrong inspection requested
|
|
03/04/2020 | PLUMBING SLAB | RICK CLINE | APPROVED | | 3/3/2020 2:24:02 PM
3/3/2020 2:24 PM TROUTMAN PLUMBING CO INC
Underground plumbing slab
Contact Name: TROUTMAN PLUMBING CO INC
Site Address: 1293 GLENWAY DR
Phone: 8282562875
e-Mail: olivia@troutmanplumbing.com
|
|
03/11/2020 | ELECTRICAL SLAB | DARIN OXENTINE | PARTIAL | eTRAKiT Inspection Request | 3/11/2020 8:57:50 AM
3/11/2020 8:57 AM SAMMY PHILLIPS ELECTRIC INC
Partial Underground
Contact Name: SAMMY PHILLIPS ELECTRIC INC
Site Address: 1293 GLENWAY DR
Phone: 3367223311
e-Mail: mhinsdale@spelectric.com
|
|
03/11/2020 | PLUMBING SLAB | DARIN OXENTINE | PARTIAL | | 3/11/2020 1:23:32 PM
accessible bathroom phase 2
|
|
03/17/2020 | PLUMBING SLAB | RICK CLINE | PARTIAL | eTRAKiT Inspection Request | 3/16/2020 9:40:31 AM
3/16/2020 9:40 AM TROUTMAN PLUMBING CO INC
Under slab
Contact Name: TROUTMAN PLUMBING CO INC
Site Address: 1293 GLENWAY DR
Phone: 8282562875
e-Mail: olivia@troutmanplumbing.com
|
|
03/31/2020 | PLUMBING ROUGH | RICK CLINE | PARTIAL | 2nd floor | 3/3/2020 1:51:19 PM
wrong inspection requested
3/6/2020 1:40:04 PM
3/6/2020 1:40 PM TROUTMAN PLUMBING CO INC
Under Slab
Contact Name: TROUTMAN PLUMBING CO INC
Site Address: 1293 GLENWAY DR
Phone: 8282562875
e-Mail: olivia@troutmanplumbing.com
3/31/2020 9:45:46 AM
2nd floor only
|
|
03/31/2020 | ELECTRICAL ROUGH | RICK CLINE | PARTIAL | 2nd floor | 3/31/2020 9:46:21 AM
2nd floor, walls only
|
|
03/31/2020 | FOOTING | RICK CLINE | APPROVED | elevator pit | 3/31/2020 9:47:29 AM
elevator pit
|
|
03/31/2020 | OPEN FLOOR FRAMING | RICK CLINE | APPROVED | rebar for elevator | |
|
03/31/2020 | FRAMING | RICK CLINE | PARTIAL | 2nd floor | 3/31/2020 9:49:06 AM
2nd floor only
|
|
04/02/2020 | FOUNDATION | RICK CLINE | APPROVED | stem wall for elevator | |
|
04/09/2020 | FOOTING | RICK CLINE | PARTIAL | 2 inside 8 outside columns | 4/7/2020 4:17:47 PM
AFTER 10AM IF POSSIBLE TS PER OMEGA
4/9/2020 10:57:46 AM
need copy of special inspections report
|
|
| FOOTING | | | 2 inside 8 outside columns | |
|
04/15/2020 | PLUMBING ROUGH | RICK CLINE | PARTIAL | | 4/15/2020 12:18:14 PM
foundation drain around the elevator shaft
|
|
04/15/2020 | ELECTRICAL ROUGH | RICK CLINE | PARTIAL | | 4/15/2020 12:19:03 PM
west end of bottom floor walls only
|
|
04/15/2020 | FRAMING | RICK CLINE | PARTIAL | | 4/15/2020 12:20:11 PM
south end of bottom floor
|
|
04/16/2020 | PLUMBING ROUGH | RICK CLINE | PARTIAL | bottom floor | |
|
04/23/2020 | ELECTRICAL ROUGH | DARIN OXENTINE | PARTIAL | | 4/23/2020 4:17:38 PM
food prep area.
|
|
| ELECTRICAL ROUGH | DARIN OXENTINE | | 2nd floor | 4/23/2020 4:17:42 PM
food prep area.
5/15/2020 10:18:18 AM
(room 163)
6/2/2020 1:02:47 PM
food prep area.
6/2/2020 1:02:47 PM
(room 163)
|
|
04/23/2020 | FRAMING | DARIN OXENTINE | PARTIAL | | 4/23/2020 4:17:43 PM
food prep area.
|
|
05/06/2020 | MECHANICAL ROUGH | RICK CLINE | PARTIAL | | 5/6/2020 9:53:06 AM
2nd floor duct seal
|
|
05/15/2020 | PLUMBING ROUGH | DARIN OXENTINE | PARTIAL | 2nd floor | 5/15/2020 10:18:06 AM
room 163
|
|
05/15/2020 | ELECTRICAL ROUGH | DARIN OXENTINE | PARTIAL | | 5/15/2020 10:18:14 AM
(room 163)
|
|
05/15/2020 | FRAMING | DARIN OXENTINE | PARTIAL | | 5/15/2020 10:18:19 AM
(room 163)
|
|
06/02/2020 | FRAMING | DARIN OXENTINE | PARTIAL | | 4/23/2020 4:17:46 PM
food prep area.
5/15/2020 10:18:23 AM
(room 163)
6/2/2020 1:02:04 PM
columns in front of building
|
|
| FRAMING | DARIN OXENTINE | | | 6/2/2020 1:02:40 PM
food prep area.
6/2/2020 1:02:41 PM
(room 163)
6/2/2020 1:02:41 PM
columns in front of building
|
|
06/02/2020 | MECHANICAL ROUGH | DARIN OXENTINE | APPROVED | | |
|
06/02/2020 | ELECTRICAL ROUGH | DARIN OXENTINE | APPROVED | | 4/23/2020 4:17:42 PM
food prep area.
5/15/2020 10:18:18 AM
(room 163)
|
|
06/09/2020 | PLUMBING ROUGH | RICK CLINE | REJECTED | | 6/9/2020 2:26:14 PM
water supply to irrigation system is not deep enough at building
|
|
06/10/2020 | PLUMBING ROUGH | RICK CLINE | APPROVED | | 5/15/2020 10:18:12 AM
room 163
6/10/2020 10:10:13 AM
irrigation supply
|
|
06/10/2020 | PLUMBING ROUGH | RICK CLINE | APPROVED | | 6/10/2020 3:27:13 PM
water supply to irrigation
|
|
06/18/2020 | FRAMING | RICK CLINE | APPROVED | | |
|
06/19/2020 | ELEC ABOVE CEILING | RICK CLINE | INCOMPLETE | | 6/19/2020 9:00:42 AM
incomplete on both floors
|
|
06/19/2020 | MECHANICAL ABOVE CEILING | RICK CLINE | PARTIAL | | 6/19/2020 9:01:34 AM
2nd floor complete except over the stairs
|
|
| MECHANICAL ABOVE CEILING | | | | |
|
06/19/2020 | PLUMBING ABOVE CEILING | RICK CLINE | PARTIAL | | 6/19/2020 9:02:13 AM
2nd floor only
|
|
06/19/2020 | BUILDING ABOVE CEILING | RICK CLINE | REJECTED | | 6/19/2020 9:03:38 AM
sub trades are incomplete.
stencil the fire barrier at elevator.
|
|
06/30/2020 | BLDG FINAL CERT OF COMP | RICK CLINE | REJECTED | | 6/30/2020 3:50:18 PM
?
|
|
| BLDG FINAL CERT OF COMP | | | | |
|
06/30/2020 | MECHANICAL FINAL CERT OF COMP | RICK CLINE | REJECTED | | 6/30/2020 3:51:28 PM
not reasdy
|
|
06/30/2020 | PLUMBING FINAL CERT OF COMP | RICK CLINE | REJECTED | | 6/30/2020 3:52:11 PM
NOT READY
|
|
06/30/2020 | ELECTRICAL FINAL CERT OF COMP | RICK CLINE | REJECTED | | 6/30/2020 3:53:24 PM
NOT READY
|
|
| ELECTRICAL FINAL CERT OF COMP | | | | |
|
06/30/2020 | MECHANICAL ABOVE CEILING | RICK CLINE | PARTIAL | | |
|
| MECHANICAL ABOVE CEILING | | | | |
|
06/30/2020 | PLUMBING ABOVE CEILING | RICK CLINE | APPROVED | | |
|
07/01/2020 | ELEC ABOVE CEILING | DARIN OXENTINE | PARTIAL | | |
|
07/23/2020 | BUILDING ABOVE CEILING | RICK CLINE | APPROVED | | |
|
07/23/2020 | BLDG FINAL CERT OF COMP | RICK CLINE | REJECTED | | 7/23/2020 9:57:35 AM
wants a TCO, instructions were given. Handrails must be installed, ADA signage must be installed at toilet rooms and parking. need Statesville zoning approval.
|
|
| BLDG FINAL CERT OF COMP | | | | |
|
06/30/2020 | FIRE FINAL CERT OF COMP | ED HODGES | PARTIAL | ok for TCO Phase I | 7/23/2020 10:50:48 AM
per email from Ed this is ok for a TCO for the Phase I project
|
|
07/23/2020 | ZONING FINAL | ELAINE ANTHONY | PARTIAL | ok for TCO Phase I | 7/23/2020 10:54:12 AM
per email from Elaine Anthony this is ok for TCO for Phase I of project
|
|
| ZONING FINAL | | | ok for TCO Phase I | |
|
07/24/2020 | MECHANICAL FINAL CERT OF COMP | RICK CLINE | PARTIAL | | 7/24/2020 12:37:38 PM
approved phase 1 for tco
|
|
07/24/2020 | PLUMBING FINAL CERT OF COMP | RICK CLINE | PARTIAL | | 7/24/2020 12:38:04 PM
approved phase 1 for tco
|
|
07/24/2020 | TEMPORARY OCCUPANCY | RICK CLINE | APPROVED | | 7/24/2020 12:40:07 PM
phase 1
|
|
07/24/2020 | ELECTRICAL FINAL CERT OF COMP | DARIN OXENTINE | PARTIAL | | 7/24/2020 1:28:50 PM
phase 1
|
|
| ELECTRICAL FINAL CERT OF COMP | | | | |
|
08/27/2020 | PLUMBING ABOVE CEILING | DARIN OXENTINE | PARTIAL | The other set of roof drains | 8/27/2020 12:58:09 PM
storm drain phase 2 office area
|
|
08/27/2020 | PLUMBING ABOVE CEILING | DARIN OXENTINE | PARTIAL | One set of roof drains | 8/27/2020 12:58:18 PM
storm drain phase 2 office area
8/27/2020 3:42:33 PM
phase 2 room drain office area
8/27/2020 3:43:41 PM
phase 2 storm drain office area.
|
|
08/28/2020 | TEMPORARY OCCUPANCY | RICK CLINE | APPROVED | renew 8/24-9/24/2020 | 8/28/2020 9:59:23 AM
renew phase 1
|
|
09/01/2020 | PLUMBING ABOVE CEILING | RICK CLINE | REJECTED | The other set of roof drains | 8/27/2020 12:58:18 PM
storm drain phase 2 office area
9/1/2020 3:45:21 PM
must be tested
|
|
09/02/2020 | PLUMBING ABOVE CEILING | DARIN OXENTINE | PARTIAL | eTRAKiT Inspection Request | 9/1/2020 4:11:41 PM
9/1/2020 4:11 PM TROUTMAN PLUMBING CO INC
Roof drains
Contact Name: TROUTMAN PLUMBING CO INC
Site Address: 1293 GLENWAY DR
Phone: 8282562875
e-Mail: olivia@troutmanplumbing.com
9/2/2020 3:32:42 PM
roof drain
|
|
09/14/2020 | FRAMING | DARIN OXENTINE | PARTIAL | | 4/23/2020 4:17:46 PM
food prep area.
5/15/2020 10:18:23 AM
(room 163)
6/2/2020 1:02:17 PM
food prep area.
6/2/2020 1:02:20 PM
(room 163)
6/2/2020 1:02:21 PM
columns in front of building
9/14/2020 1:02:55 PM
metal studs above ceiling
|
|
| FRAMING | | | | |
|
09/14/2020 | ELECTRICAL SLAB | DARIN OXENTINE | PARTIAL | eTRAKiT Inspection Request | 9/14/2020 1:06:00 PM
office area
|
|
09/17/2020 | PLUMBING ABOVE CEILING | RICK CLINE | INCOMPLETE | eTRAKiT Inspection Request | |
|
| PLUMBING ABOVE CEILING | RICK CLINE | | | |
|
| PLUMBING ABOVE CEILING | RICK CLINE | | eTRAKiT Inspection Request | |
|
09/17/2020 | ELEC UNDERGROUND | RICK CLINE | INCOMPLETE | | |
|
| ELEC UNDERGROUND | RICK CLINE | | | |
|
09/22/2020 | TEMPORARY OCCUPANCY | RICK CLINE | APPROVED | RENEW 9/24-10/24/2020 | |
|
09/24/2020 | PLUMBING ROUGH | RICK CLINE | REJECTED | PM Please | 9/24/2020 11:22:23 AM
wrong inspection
|
|
09/24/2020 | PLUMBING SLAB | RICK CLINE | PARTIAL | eTRAKiT Inspection Request | 3/17/2020 10:50:35 AM
3/16/2020 9:40 AM TROUTMAN PLUMBING CO INC
Under slab
Contact Name: TROUTMAN PLUMBING CO INC
Site Address: 1293 GLENWAY DR
Phone: 8282562875
e-Mail: olivia@troutmanplumbing.com
9/24/2020 11:23:16 AM
Phase 2 plg slab
|
|
| PLUMBING SLAB | | | eTRAKiT Inspection Request | |
|
09/24/2020 | MECHANICAL ROUGH | RICK CLINE | PARTIAL | PM Please | 9/24/2020 11:24:38 AM
phase 2 duct seal, north end to center column line
|
|
09/24/2020 | ELECTRICAL ROUGH | DARIN OXENTINE | PARTIAL | PM Please | 4/23/2020 4:17:42 PM
food prep area.
5/15/2020 10:18:18 AM
(room 163)
6/2/2020 1:02:47 PM
food prep area.
6/2/2020 1:02:47 PM
(room 163)
9/24/2020 1:01:10 PM
wall rough office area
|
|
| ELECTRICAL ROUGH | | | PM Please | |
|
09/24/2020 | FRAMING | RICK CLINE | PARTIAL | PM Please | 4/23/2020 4:17:46 PM
food prep area.
5/15/2020 10:18:24 AM
(room 163)
6/2/2020 1:02:28 PM
food prep area.
6/2/2020 1:02:31 PM
(room 163)
6/2/2020 1:02:31 PM
columns in front of building
9/24/2020 3:41:57 PM
Phase 2 north end to the center column line
|
|
| FRAMING | | | PM Please | |
|
10/06/2020 | MECHANICAL ROUGH | RICK CLINE | REJECTED | | 10/6/2020 11:06:40 AM
not ready for duct seal in south side of center column line
|
|
10/07/2020 | MECHANICAL ROUGH | DARIN OXENTINE | PARTIAL | | 10/6/2020 11:06:53 AM
not ready for duct seal in south side of center column line
10/7/2020 12:19:58 PM
duct seal
|
|
| MECHANICAL ROUGH | | | | |
|
10/07/2020 | ELECTRICAL ROUGH | DARIN OXENTINE | PARTIAL | | 5/15/2020 10:18:19 AM
(room 163)
6/2/2020 1:02:47 PM
food prep area.
6/2/2020 1:02:47 PM
(room 163)
|
|
10/07/2020 | FRAMING | DARIN OXENTINE | PARTIAL | 1st floor | 4/23/2020 4:17:46 PM
food prep area.
5/15/2020 10:18:24 AM
(room 163)
6/2/2020 1:02:23 PM
food prep area.
6/2/2020 1:02:26 PM
(room 163)
6/2/2020 1:02:26 PM
columns in front of building
|
|
| FRAMING | | | 1st floor | |
|
10/08/2020 | PLUMBING ROUGH | RICK CLINE | PARTIAL | 2nd floor | 5/15/2020 10:18:13 AM
room 163
6/10/2020 10:10:16 AM
room 163
6/10/2020 10:10:16 AM
irrigation supply
10/8/2020 1:44:12 PM
toilet rooms 114 and 115
|
|
| PLUMBING ROUGH | RICK CLINE | | 2nd floor | 10/8/2020 1:44:26 PM
room 163
10/8/2020 1:44:26 PM
room 163
10/8/2020 1:44:26 PM
irrigation supply
10/8/2020 1:44:27 PM
toilet rooms 114 and 115
|
|
| PLUMBING ROUGH | RICK CLINE | | PM Please | 10/8/2020 1:44:25 PM
room 163
10/8/2020 1:44:25 PM
room 163
10/8/2020 1:44:25 PM
irrigation supply
10/8/2020 1:44:25 PM
toilet rooms 114 and 115
|
|
10/16/2020 | PLUMBING ROUGH | DARIN OXENTINE | PARTIAL | | 5/15/2020 10:18:13 AM
room 163
6/10/2020 10:10:16 AM
room 163
6/10/2020 10:10:16 AM
irrigation supply
10/8/2020 1:44:24 PM
room 163
10/8/2020 1:44:24 PM
room 163
10/8/2020 1:44:25 PM
irrigation supply
10/8/2020 1:44:25 PM
toilet rooms 114 and 115
10/16/2020 10:36:58 AM
bathrooms and ac units ok pending insulation.
|
|
| PLUMBING ROUGH | | | | |
|
10/16/2020 | FRAMING | DARIN OXENTINE | PARTIAL | | 5/15/2020 10:18:24 AM
(room 163)
6/2/2020 1:02:35 PM
food prep area.
6/2/2020 1:02:36 PM
(room 163)
6/2/2020 1:02:38 PM
columns in front of building
10/16/2020 10:37:35 AM
bathroom walls
|
|
| FRAMING | | | | |
|
10/16/2020 | ELECTRICAL ROUGH | DARIN OXENTINE | PARTIAL | | 10/16/2020 10:38:06 AM
bathrooms ok
|
|
| ELECTRICAL ROUGH | | | | |
|
10/21/2020 | ELEC ABOVE CEILING | DARIN OXENTINE | PARTIAL | | 10/21/2020 12:56:00 PM
hard ceiling areas
|
|
10/21/2020 | MECHANICAL ABOVE CEILING | DARIN OXENTINE | PARTIAL | | 10/21/2020 12:57:05 PM
hard ceiling areas
|
|
| MECHANICAL ABOVE CEILING | | | | |
|
10/22/2020 | TEMPORARY OCCUPANCY | DARIN OXENTINE | REJECTED | renew 10/24-12/24/2020 | 10/22/2020 8:45:49 AM
not ready
|
|
10/29/2020 | MECHANICAL ABOVE CEILING | DARIN OXENTINE | APPROVED | | |
|
11/05/2020 | ELEC ABOVE CEILING | DARIN OXENTINE | PARTIAL | | 11/5/2020 1:26:19 PM
offices ok pending rest rooms and clouds.
|
|
11/10/2020 | ELEC ABOVE CEILING | DARIN OXENTINE | PARTIAL | | 11/10/2020 2:47:04 PM
hard ceiling & bathrooms
|
|
11/19/2020 | LOW VOLTAGE FINAL | DARIN OXENTINE | APPROVED | | |
|
11/19/2020 | ELEC ABOVE CEILING | DARIN OXENTINE | PARTIAL | | 11/19/2020 9:07:15 AM
pending clouds
|
|
11/24/2020 | ELEC ABOVE CEILING | GERALD JOHNSON | PARTIAL | | 11/24/2020 2:26:48 PM
phase 2 ok
|
|
| ELEC ABOVE CEILING | GERALD JOHNSON | | | 11/24/2020 2:26:52 PM
phase 2 ok
|
|
| ELEC ABOVE CEILING | GERALD JOHNSON | | | 11/24/2020 2:26:53 PM
phase 2 ok
|
|
| ELEC ABOVE CEILING | GERALD JOHNSON | | | 11/24/2020 2:26:53 PM
phase 2 ok
|
|
| ELEC ABOVE CEILING | GERALD JOHNSON | | | 11/24/2020 2:26:53 PM
phase 2 ok
|
|
| ELEC ABOVE CEILING | GERALD JOHNSON | | | 11/24/2020 2:26:53 PM
phase 2 ok
|
|
| ELEC ABOVE CEILING | GERALD JOHNSON | | | 11/24/2020 2:26:53 PM
phase 2 ok
|
|
| ELEC ABOVE CEILING | GERALD JOHNSON | | | 11/24/2020 2:26:52 PM
phase 2 ok
|
|
11/24/2020 | MECHANICAL FINAL CERT OF COMP | GERALD JOHNSON | PARTIAL | | 11/24/2020 2:26:54 PM
phase 2 ok
|
|
| MECHANICAL FINAL CERT OF COMP | GERALD JOHNSON | | | 11/24/2020 2:26:58 PM
phase 2 ok
|
|
| MECHANICAL FINAL CERT OF COMP | GERALD JOHNSON | | | 11/24/2020 2:26:57 PM
phase 2 ok
|
|
11/24/2020 | PLUMBING FINAL CERT OF COMP | GERALD JOHNSON | PARTIAL | | 11/24/2020 2:26:59 PM
phase 2 ok
|
|
| PLUMBING FINAL CERT OF COMP | GERALD JOHNSON | | | 11/24/2020 2:27:07 PM
phase 2 ok
|
|
| PLUMBING FINAL CERT OF COMP | GERALD JOHNSON | | | 11/24/2020 2:27:06 PM
phase 2 ok
|
|
11/24/2020 | TEMPORARY OCCUPANCY | GERALD JOHNSON | APPROVED | renew 10/24-12/24/2020 | |
|
| ELECTRICAL FINAL CERT OF COMP | RONNIE BROOME | | | |
|
12/04/2020 | ELECTRICAL FINAL CERT OF COMP | DARIN OXENTINE | REJECTED | | 12/4/2020 10:45:41 AM
wire cubicles.
|
|
12/04/2020 | CERT OF OCCUPANCY | DARIN OXENTINE | REJECTED | | |
|
| CERT OF OCCUPANCY | | | | |
|
12/04/2020 | BLDG FINAL CERT OF COMP | DARIN OXENTINE | REJECTED | | 12/4/2020 10:49:17 AM
fire final, zoning, install cubicle
|
|
12/04/2020 | MECHANICAL FINAL CERT OF COMP | DARIN OXENTINE | APPROVED | | 11/24/2020 2:26:57 PM
phase 2 ok
12/4/2020 10:50:31 AM
phase 2
|
|
12/04/2020 | PLUMBING FINAL CERT OF COMP | DARIN OXENTINE | APPROVED | | 11/24/2020 2:27:06 PM
phase 2 ok
12/4/2020 10:51:39 AM
phase 2
|
|
01/07/2021 | ELECTRICAL FINAL CERT OF COMP | DARIN OXENTINE | APPROVED | | |
|
01/08/2021 | FIRE FINAL CERT OF COMP | ED HODGES | APPROVED | | 7/23/2020 10:52:26 AM
7/23 has TCO approval per email from Ed for Phase I
|
|
01/08/2021 | BLDG FINAL CERT OF COMP | DARIN OXENTINE | APPROVED | | |
|
01/08/2021 | CERT OF OCCUPANCY | DARIN OXENTINE | APPROVED | | |
|
01/08/2021 | COMPLETE PERMIT** | DARIN OXENTINE | APPROVED | | |
|